介绍了该工程采用卸载和锚杆静压钢管桩相结合的抢险加固过程。
The process of emergency reinforcement with unloading and steel pipe pile jacked by anchor bolt was introduced.
另外,卸载后,在正的受拉状态下,对于桩体和锚杆钢筋,变形均有一定程度的恢复。
In addition, there is a certain recovery of deformation for pile body and anchor steel under the forward tension condition after unloading.
另外,卸载后,在正的受拉状态下,对于桩体和锚杆钢筋,变形均有一定程度的恢复。
In addition, there is a certain recovery of deformation for pile body and anchor steel under the forward tension condition after unloading.