从长远来看,高昂的单位造价必定会对数目造成限制。
“单位造价调整法”应归入市场比较法吗?。
Shall "Unit Cost Adjustment Method" Belong to Comparison Approach?
针对各阶段的特点,提出建设单位造价控制措施。
The strategies of cost control can be put forward according to the characteristics of every stage.
这两种物资之所以无效是因为它们并不适合居住,且单位造价高、运输不便、不够灵活。
Both are ineffective because of their inappropriateness, high unit cost, transport problems, and inflexibility.
任何时间任何项目标现实单位造价为谁人项目所耗费的累计费用除以谁人项目标累计单位数量。
The actual unit cost for any item at any time is obtained by dividing the accumulated costs charged to that item by the accumulated units of work performed.
风力发电的趋势是进步机组的经济性,进步单机的发电容量等级和效率,降低单位造价及发电本钱。
The trend of wind power generation is to improve the economic performance of the unit, to improve the level and efficiency of single generation capacity, reduce unit costs and generating costs.
首先,建立完善的规章制度,严格对工程造价咨询单位的管理。
First, establish and improve rules and regulations, strictly advisory unit cost of the project's management.
本文就建设单位在工程造价管理跟控制进行简单分析,且提出了一些建议。
In this paper, the construction project cost management and control in construction units was analysed simply and some Suggestions were made.
通过实施全过程控制来保证对建设单位有效控制工程造价。
Thus, the efficient control of project cost for construction units can be guaranteed through implementing whole course control.
本文提出单位长度管线造价及管网能耗即环状管网年动力费的计算方法。
This paper advances calculation method for unit construction prices of pipelines and annual power cost.
张拉整体理论上可以做到非常大的跨度,并且随着结构跨度的增大,其单位面积自重和造价的增加并不大。
Tensegrity structure can achieve very large span in theory and the unite area deadweight cost doesn't increase much when the span increases.
建设实施阶段,建设单位在招投标、合同管理、材料价格、施工管理(监理)、工程决算等几个方面,加强管理能够有效地控制工程造价。
Project cost can be effectively controlled from the aspects of implementation, bidding, contract management, material and stuff price, construction supervision and project budget.
是提高滤速增加单位面积出水量和成倍提高截污能力,降低工程造价和减少占地面积最有效的途径。
Is to improve the filtration rate per unit area increases exponentially increase the amount of water and interception capabilities, reduce project cost and most effective way to reduce the footprint.
有两种可供选择的方法将用来进行结构造价的近似估价:其一是根据单位平方英尺建筑面积,另一种则是根据所用的结构材料体积进行估价。
Two alternative means will be provided for making an approximate structural cost estimate: one on a square foot of building basis, and another on volumes of structural materials used.
本文主要从建设单位角度分析了房建项目施工阶段造价控制。
This paper aims to make an analysis of control cost on the construction phase from the perspective of construction unit.
从四个方面论述工程造价咨询单位在工程项目建设各阶段的作用。
This paper discusses the effect on Construction Budget Consulting Organization in phase of project construction from four aspects.
多数建设单位均将工作重点放在人防工程的竣工结算的审核上,忽视了对造价形成过程的控制,尤其是对其中的关键环节的控制。
Most construction units focus on the audit settlement of air defense projects, and ignore the control of the formation process of cost, especially the key aspects of the control.
经理的目的将发现提供创造价值的最好的整体范围的企业能力和商务单位的组合。
The manager's objective is to find the combination of corporate capabilities and business units that provides the best overall scope for creating value.
该法以梁单位长度的造价为目标函数;
关于工程造价管理的话题这几年业内议论颇多,做好建设单位的造价管理是项目管理中重要的一环。
In recent years, the topic of project cost management was talked a lot in this industry. Good project cost management of the construction unit is an important part in the project management.
希望通过对华北石化工程造价控制的研究,为中国石油其他单位的工程造价控制提供有益的参考。
I hope that the study of engineering cost control in Hua Bei petroleum chemical company will provide a reference for other enterprises of Petrochina.
经过经济性分析,赤泥混合基层的工程造价比传统基层材料单位压实方低10~20元。
According to economic analysis, engineering cost of red mud road base per compressive m3 is CNY 10~20 Yuan lower than traditional road base materials.
由于盾构机的造价很高,其选型还必须考虑我国的国情以及施工单位的承受能力。
The situation of our country and construction enterprises must also be considered when selecting a shield machine for its high price.
由于盾构机的造价很高,其选型还必须考虑我国的国情以及施工单位的承受能力。
The situation of our country and construction enterprises must also be considered when selecting a shield machine for its high price.
应用推荐