• 陕西电力科学研究院华电蒲城电厂该厂12号330MW机组实施了改造,取得了满意结果。

    The retrofitting has been conducted on unit1,2 of Huadian Pucheng Power Plant with capacity of 330MW under the co-operation of Shaanxi Electric Power Research Institute and above-mentioned plant.

    youdao

  • 陕西电力科学研究院华电蒲城电厂该厂12号330MW机组实施了改造,取得了满意结果。

    The retrofitting has been conducted on unit1,2 of Huadian Pucheng Power Plant with capacity of 330MW under the co-operation of Shaanxi Electric Power Research Institute and above-mentioned plant.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定