• 另外宣布的是,ABB选中换流站提供800伏特高压直流变压器设备。

    As separately announced, ABB has also been selected to supply the 800 kilovolt (kV) UHVDC transformers for both converter stations.

    youdao

  • 800伏特高压直流变压器实现远距离容量输电特高压输电线路的关键设备。

    The 800 kV UHVDC transformer is a key component of ultrahigh-voltage power links that deliver large amounts of electricity over very long distances.

    youdao

  • 补好的补口使用带8直流的漏涂检测仪来检测

    The finished joints shall be inspected with a holiday detector set at 8kV DC.

    youdao

  • 它们工作300赫兹直流母线电压400伏特输出功率120瓦特,输出电压16伏特。

    All of them have been operation at 300 kHz, bus voltage of 400 V, output power of 120 W, output voltage of 16 V.

    youdao

  • 稀土永磁直流电机应用于试验车并进行了公里道路试验,结果良好。种液体循环式锌-空气电池做了实验室道路试验并进行了性能分析和评价。

    A rare earth permanent magnetism brushless direct current motor is set in the test-EV and runs in order during a course of the test on roads near one thousand kilometers.

    youdao

  • 本文论述320安匝直流电流仪器仪表精密校验装置设计原理

    The design principle of a precision calibrating-testing device for up to 320 kilo-ampere-turns is described.

    youdao

  • 模拟输入DC额定电压0-10,24直流保护,以最大限度,输入阻抗20欧姆

    Analog Input: Rated for 0-10 Volts DC, protected to 24 Volts DC maximum, input impedance 20k ohms;

    youdao

  • 其中,液压源的马力10200不等,采用直流或者交流供电

    The hydraulic power unit is from 10 to 200 kilowatts, can be used in DC or AC power.

    youdao

  • 直流输电线路距离往往上公里,线路越长、发生故障概率高,同时查找故障难度越大。

    The longer the lines are, the greater probability of line fault is, and the more difficult it will be to find the fault location.

    youdao

  • 阶段具有分尺等级螺钉以及0.5毫米脚间距的特点,微型直线轴承非接触式限位开关带有一步进机直流伺服电机编码器选择

    Stage features micrometer grade screw with lead pitch 0.5 mm, miniature linear bearing and non-contact limit switches with a choice of either stepper or DC servo motor with encoder.

    youdao

  • 以后情况如何,《史记》上没有记载,但是民间传说:徐福庞大船队,载着数童男童女最后去了日本国

    Of what happened after this, the Historical Memoirs gives no account. According to popular legends, Xu Fu with his large fleet and virgin boys and girls eventually landed in today's Japan.

    youdao

  • 合同更大计划一部分,这个计划包括一个位于Finnbole的400交流变电站,一个位于瑞典境内的70直流架线以及一条200米的海底电缆

    The contract is part of a larger scheme that includes a 400-kv ac (alternating current) substation in Finnbole, a 70 - km DC overhead line in Sweden and a 200-km submarine cable.

    youdao

  • 合同更大计划一部分,这个计划包括一个位于Finnbole的400交流变电站,一个位于瑞典境内的70直流架线以及一条200米的海底电缆

    The contract is part of a larger scheme that includes a 400-kv ac (alternating current) substation in Finnbole, a 70 - km DC overhead line in Sweden and a 200-km submarine cable.