参与北京新工厂的设计与建设,达到国际先进的绿色环保建筑的要求,推动和建立可口可乐环境和安全体系。
Involve the BJ plant design and build, to meet the International Green Building standard. Accelerate BJ plant to establish their Coca-Cola EHS system.
本文根据建筑结构抗震规范规定的振型分解反应谱法和时程分析法,对采用消能减振装置加固的北京饭店西楼进行分析与设计。
The seismic structural analyses and design are carried out by means of response spectrum and time history methods for the west wing of Beijing Hotel.
本文根据建筑结构抗震规范规定的振型分解反应谱法和时程分析法,对采用消能减振装置加固的北京饭店西楼进行分析与设计。
The seismic structural analyses and design are carried out by means of response spectrum and time history methods for the west wing of Beijing Hotel.
应用推荐