汛期分期研究是实现电站、水库动态汛限水位调度控制的基础。
The research on flood season staging is the foundation of scheduling control on dynamic flood limit water level of power stations and reservoirs.
在此基础上,首次提出了动态汛限水位过程线的基本概念与确定方法。
On this basis, the concept of variable process curve of reservoir's restricted water level and its determining method are proposed.
在此基础上,联合降雨预报和洪水预报确定了桓仁水库动态控制汛限水位的上限。
Combined with precipitaton forecast and flood forecast, the upper bound ofdynamic control on limit water level of Huanren Reservoir in flood season was determined.
本文探讨一种新型的、动态的汛限水位控制方法,并以此方法对密云水库汛限水位进行计算分析。
A new dynamic way to analyze the flood control level of Miyun reservoir is presented in this paper.
水库汛限水位动态控制中的风险主要来自洪水预报和降雨预报的误差,其次来自决策者的决策误差。
The risk of flood operation mainly comes from the errors of flood and rainfall forecast, in the next place, the errors comes from the decision-maker's subjective preference.
水库汛限水位动态控制中的风险主要来自洪水预报和降雨预报的误差,其次来自决策者的决策误差。
The risk of flood operation mainly comes from the errors of flood and rainfall forecast, in the next place, the errors comes from the decision-maker's subjective preference.
应用推荐