清单6展示了规则选择加工工厂的实现。
Listing 6 shows the implementation of the rule Select Manufacturing Plant.
准备一份加工过程程序清单,标明在哪些地方可能发生重大危险,以及将采取或正在采取何种预防控制措施。
Prepare a process program list, indicating where possible significant risk, and will be taken or are taking the measures of prevention and control.
不属工程量清单范围内的设计变更;提供的工程地质资料与实际不符而增加工程量影响进度的。
Design alteration isn't in the range of construction work quantity; supplied geological information, which doesn't conform to actual condition, has an influence on construction progress.
依据切削加工过程的绿色特性分析及其IPO模型,对该加工过程进行清单分析。
According to the green characteristic analyses and the IPO model of the cutting manufacture process, this manufacture process carried on inventory analysis.
依据切削加工过程的绿色特性分析及其IPO模型,对该加工过程进行清单分析。
According to the green characteristic analyses and the IPO model of the cutting manufacture process, this manufacture process carried on inventory analysis.
应用推荐