当作业到达部署管理器时,登录成功,并且作业将运行。
When the job reaches the deployment manager, login succeeds, and the job will run.
这些小磁铁代表了不同的作业。当时钟指针到达并收集了这些磁铁,就该交作业了。
Small magnets represent different assignments. When the clock hand reached and collects the magnets - the assignments are due.
当时钟指针到达并收集了这些磁铁,就该交作业了。
When the clock hand reached and collects the magnets - the assignments are due.
图6为模板A创建一个清理作业,它在实例到达结束状态之后立即删除它们。
Figure 6 shows the creation of a cleanup job for template a, which will delete all instances as soon as they reach an end state.
中午11点25分,吴丰山到达中正机场后给陈国祥打电话:“事情进行顺利,开始准备作业。”
At 11:25am, after arriving at Chiang Kai-shek International Airport, Wu Fengshan spoke to Chen Guoxiang on the phone, "Things are going as planned."
在进行浮动的海上作业时,节流和压井管线从水下防喷器组出来,之后沿钻井隔水导管外侧面到达水面。
In floating offshore operations, the choke and kill lines exit the subsea BOP stack and then run along the outside of the drilling riser to the surface.
在海洋使用浮动船作业时,节流和压井管线是从海底防喷器组直接排出的,之后通过外部的导管到达海平面。
In floating offshore operations, the choke and kill lines exit the subsea BOP stack and run along the outside of the riser to the surface.
如果船只在确认日期内已到达装货港,现在就能够进行装货作业。
If the vessel had arrived at the loading port within the Confirmed Dates. the loading operation could be carried out now.
当我到达学校时,我早上首先阅读和交作业。
When I get to school, I do the morning reading and hand in my homework firstly.
给出实例以验证前述研究,对列车到达时刻、车列解编作业时间对鲁棒性阶段计划的影响进行了分析。
On the basic of the existing researches, this dissertation studied stage plan for the purpose of get a robust stage plan.
临界密集到达时间受到达流强度、变异系数、驼峰作业负荷等因素的影响。
The critical intensity arrival time is influenced by input flow intensity, coefficient of variation, hump-working load, etc.
影响到达解体系统设备数量的主要因素是驼峰能力及其解体作业。
The detention time of trains of receivig-breaking-up system in transit is mainly influenced by humping capacity.
研究了目标函数是最小最大完成时间的同类机调度问题,其中作业到达时间可能不同。
The problem of uniform parallel machine scheduling was considered so as to minimizing total completion times.
研究了目标函数是最小最大完成时间的同类机调度问题,其中作业到达时间可能不同。
The problem of uniform parallel machine scheduling was considered so as to minimizing total completion times.
应用推荐