上述文件采用唯一识别号,并由工程总监指定设计工程师编制。
The above documents which are uniquely identified are prepared by a design engineer designated by the Engineering Director.
所有的图纸和文件都要标明客户名,项目编号,鉴别号。
All documents and drawings shall state the name of Client, Work No., Identification No.
所有的图纸和文件都要标明客户名,项目编号,鉴别号。
All documents and drawings shall state the name of Client, Work No., Identification No.
应用推荐