但是如果初级工程师真的工作了更长的时间,那么将可能出现超出预算的情况。
But if the junior engineers are actually working longer hours, then we have a situation in which the effort is probably running over budget.
在国内外专家的指导下,技术力量雄厚,拥有初级工程师2名,技术师5名,员工60名。
Now we have 2 senior engineers, 5 artisan and a staff of 60. With the help of the proficient, we got abundant technical and experience.
真的到了初级工程师追赶进度然后超出高级工程师的成本的时候,再回过头来使项目回到正规可能就太晚了。
By the time the junior engineers catch up and then exceed the costs of the seniors, it may be too late to get the project back on track.
让我们假设工程以高级工程师的劳动成本来评估(也就是高成本),但是实际上工作是由更多初级工程师来执行的(也就是低成本)。
Let's say the project was estimated based on the labor of senior engineers (i.e., expensive), but the work is actually being performed by more junior-level engineers (i.e., at a lower cost).
尽管在一些情况下这种管理是必要的(比如,团队完全是由初级,无经验的工程师组成的),它仍是一个效率很低的模型。
Although in some instances this type of control is necessary (e.g., if the team is composed of extremely junior, inexperienced engineers), it is a very inefficient model.
尽管在一些情况下这种管理是必要的(比如,团队完全是由初级,无经验的工程师组成的),它仍是一个效率很低的模型。
Although in some instances this type of control is necessary (e.g., if the team is composed of extremely junior, inexperienced engineers), it is a very inefficient model.