然后制订一张时间表或时间分配图。
需求图、参数图以及分配图是UML中所没有的新图。
Requirements, Parametrics, and Allocations are new diagrams not available in UML.
把你每周要完成的任务一一列出来,然后制订一张作息表或时间分配图。
Make a list of your weekly tasks. Then make a schedule or chart of your time.
把你每周要完成的任务一一列出来,然后制订一张时间表或时间分配图。
Make a list of your weekly tasks. Then make a schedule or chart of your time.
首先把每周要完成的任务一一列出来,然后制作一张时间表或时间分配图。
Make a list of your weekly tasks. Then make a schedule or chart of committed time such as eating, sleeping, meetings, classes, etc.
介绍了PLC在继电器控制系统改造中的应用,给出了I/O分配图及部分程序。
This paper introduces the application of PLC in reconstructing the relay control system and gives I/O distribution diagram and some of programs.
pvresize:如果底层分区也已经扩展了,那么可以用这个操作扩展PV;如果分配图允许的话,它也可以缩小 PV。
pvresize extends PVs if the underlying partition has also been extended; it shrinks PV if the allocation map permits it.
图4显示了配置文件创建向导的节点和主机名分配面板。
Figure 4 shows the node and host name assignment panel for the profile creation wizard.
当用户在网络页面上提交输入(图34)时,它会从联系汇处分配一个联系,并驱动IO,这又反过来驱动宏以及主机程序。
When the user submits input on the web page (Figure 34), this allocates a connection from the connection pool and drives the IO, which in turn drives the macro and the host application.
一旦您开始了创建,如果您选择了一个计划内的测试团队,那么您可以查看是哪个团队成员分配给了该项目(同样见于图12)。
Once you have that set up, if you select a test team within a plan, you can see which team members are assigned to this project (as shown in Figure 12).
客户端时间分配显示前面的饼图各部分客户端时间的详细说明。
Client time distribution shows a detailed break down of the client time component from the previous pie chart.
图1:每个用例都有一组分配的情境。
ASSIGNED 查询表(图5)需要检索分配给用户的任务,但是,如果有错误就不能完成。
The DW.ASSIGNED Query Table (Figure 5) is needed to retrieve tasks that are assigned to the user, but is never completed in case of an error.
图7:由系统组件所着色的项目团队成员的工件分配。
Figure 7: Project team member assignment of artifacts colored by system component.
图5:用分配给项目的在开发中的组件的颜色建模的用例实例。
Figure 5: Example of use case modeling with color assignments to the components under development for the project.
图3:将功能分配到原子级产品组件。
Figure 3: The allocation of functions to atomic product components.
图5展示了在RAM中分配的以下内存集。
Figure 5 shows the following memory sets are allocated in ram.
图6:由分配的有色的附着注释所指示的项目系统组件。
Figure 6: Project system components denoted by assigned colored sticky note.
图1给出了为Bootcontrol分区分配字母w:之后的样子。
Figure 1 shows how we assigned the letter w: to our Bootcontrol partition.
图26显示了分配给具体角色——原来在Method Composer中创建的角色——的任务。
Figure 26 shows that the task has been assigned to a specific role — a role originally created in Method Composer.
图41显示了观察已分配工作的两种方式。
Figure 41 shows two other ways to see the work that is assigned.
图6:零售系统的分配白盒场景的序列图。
Figure 6: Distribution white box scenario Sequence diagram for a retail system.
图2显示了为包裹的各种重量与体积组合分配运输和处理费用的决策表。
Figure 2 shows a decision table that assigns shipping and handling charges for various combinations of package weight and volume.
我曾经见到有图这样显示,最佳的是,将单个资源分配到两个项目中。
I have seen graphs showing that, optimally, a single resource should be assigned to two projects.
图5中所显示的移动细节表明,您将能量平均分配到两个这端口之上。
The details for the movement in Figure 5 show that you will apply power equally to both ports.
您可以使用列表中嵌入下拉菜单来轻松分配优先级(见于图17)。
You can assign priorities easily by using the drop-down menu embedded in the list items (see Figure 17).
当您将单个的目录引入可管理的块,并将它们分配给单独的服务器时(图4),您就将目录分区了。
When you carve a single directory into manageable chunks and assign them to separate servers (Figure 4), you are partitioning the directory.
工作流是指通过将整个工作分解成若干任务并自动化这些任务的分配与进展,以在不同团队间有效地分配工作的系统(图16)。
Workflow refers to systems that allow efficient distribution of work between teams of people by breaking the work into tasks and automating the distribution and progression of those tasks (Figure 16).
图2显示了为示例应用程序重新分配的文件。
Figure 2 shows the files that were relocated for the sample application.
图4显示管理员屏幕,在这个屏幕中可以将模块中的访问权限分配给角色。
Figure 4 shows the administrators screen to assign roles to access permissions within a module.
应用推荐