概算定额是确定一定计量单位扩大分部分项工程的人工、材料和机械消耗数量的标准。
The budgetary estimate fixed quantity is the determination certain measuring unit expands the branch sub-item project the man-power, the material and the machinery consumption quantity standard.
在工程量清单计价模式下工程造价由分部分项工程费、措施项目费、其他项目费、规费和税金等构成。
When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.
利用分部分项工程返修费率的概念,以线拟合模型模拟最佳质量成本,并将其应用于某施工企业质量成本管理工作。
This paper presents simulating optimal quality cost by using the ratio of reconstruction cost on divided engineering and curve fitting model, and applies the model in a.
在施工中进行各工序书面技术交底,参加各工序的检验和工程验收,对工程的分部分项工程进行质量检查和评定工作。
Written technical disclosure of each process in the construction, to participate in the inspection and project acceptance process, quality inspection and assessment of sub projects.
清单项包括分部分项工程量清单39项,措施项目清单13项和其他项目清单3项,并对各清单进行了清单工程量计算。
All project is divided into sub engineering quantity list 39, list 13 items measure project and other project list 3 items on the list, and the list of engineering quantity calculation.
那么,如何有条不紊地安排这些分部分项工程、使其能够一环接一环良性地进行下去,下面,本文就施工工序地安排谈一些看法。
Then, according to how to arrange these sub-projects orderly and enable them to proceed well-behaved, the paper makes some comments on the construction procedures in the following.
公伯峡水电站引水发电工程已具备蓄水条件并通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。
The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.
公伯峡水电站引水发电工程已具备蓄水条件并通过分部分项工程验收,分部分项工程优良率100%,各分部分项单元工程优良率均在85%以上。
The Gongboxia Hydropower Station's water diversion & electric generating project have be provided with water storage and also passed the check and acceptance of section project.
应用推荐