• 查看保存影响分析项目

    View the saved impact analysis projects.

    youdao

  • 分析项目度量过程度量。

    Analyze project metrics and process metrics.

    youdao

  • 分析项目风险

    Analyze project risks.

    youdao

  • 分析项目名称其它相关信息

    Enter the name and other pertinent information of the item being analyzed.

    youdao

  • 分析项目商务要求

    Analyzes project commercial requirements.

    youdao

  • 四个主要分析项目语气情态评价人称

    The four major exponents for analysis are: mood, modality, evaluation and person.

    youdao

  • 定位分析项目点击绿色QuickStart图标

    Locate the analysis project, and click the green Quick Start icon.

    youdao

  • 方法分析项目现有资料和进行知情人深入访谈

    Methods: Analyzing existing data and applying key informant in-depth interview.

    youdao

  • 所收集数据调查基础上形成一系列次生分析项目

    Data collected by the survey also formed the basis of a range of secondary analysis projects.

    youdao

  • 进一步了解这些二次分析项目可以找到研究方案网页

    Further information on these or pending secondary analysis projects can be found on the research programme page.

    youdao

  • 然而通常甚至我们开始分析项目之前,就需要项目进行估算

    However, we often need to estimate projects before we have even started the analysis on them.

    youdao

  • 本文分析项目工程造价理论基础上提出几点理由以及解决方案

    Based on the analysis of the project cost theory put forward some problems and solutions.

    youdao

  • 使用引擎可以方便分析项目计划执行情况确保项目按期顺利完成

    It's convenient to analyze the implementation of project plan by using the weak workflow engine. The weak workflow engine can ensure to complete the project on time.

    youdao

  • 本文通过某区旧城改造安置房建设工程实例分析项目采用BT模式优势

    This paper analyzes the advantage of the project to use the BT model by a example in the transformation of the old city of the housing placement project.

    youdao

  • 油品闪点测量炼油装置主要分析项目生产过程中具有重要作用

    The measurement of flash point for petroleum products is one of major analyzing item to refining installation, it has important action in produce process.

    youdao

  • 第五专门分析项目各阶段完成情况、完成时间长短项目系统风险之间关系

    The last part present the relation of lasting time and the system risk of projects and give the concept of time risk in the part I addresses the happiness of risk factors within the projects.

    youdao

  • 正是哥本哈根共识中心急速基础开展的新的艾滋病研究分析项目所追求——重新思索HIV。

    That is what the Copenhagen Consensus Center and the Rush Foundation are doing in a new HIV research and analysis project, RethinkHIV.

    youdao

  • 项目启动的时候,项目团队应该首先确定分析项目需求然后才选择适当的技术满足项目需求。

    When initiating a project, the project team should first identify and analyze the project requirements, then select an appropriate technology that effectively supports those project requirements.

    youdao

  • 分析项目沟通体系建立必要条件过程提出分阶段逐步建立项目沟通管理体系的理论和方法。

    Analyze the necessary conditions and process to establish the project communication system, put forward the way to establish the theory and methods of project communication management step by step.

    youdao

  • 根据项目大小前景中的信息可能在将正确地分析项目经济相关性业务用例工作产品进一步详细描述

    Depending on the size of the project, the information in the Vision may be further elaborated in the Business Case work product that would precisely analyze the economic relevance of the project.

    youdao

  • 分析项目组合管理领域中的EMPO持续角色之前我们来简要地了解一下什么是项目组合管理。

    Before examining the sustaining role of the EMPO within the domain of Portfolio Management, let's first briefly touch on what Portfolio Management is all about.

    youdao

  • 黄酒挥发含量测定是评价黄酒质量项较重要的理化指标也是一项不易准确检测分析项目

    Volatile esters content in yellow rice wine was an important index to assess wine quality and also an analytic item hard for accurate measurement.

    youdao

  • 针对目前项目造价偏低现象成本预测、成本控制降低成本有效途径方面分析项目成本管理

    According to the current phenomenon of low item cost, the paper analyses the item cost management from three aspects: cost projection, cost control and the effective measures of reducing cost.

    youdao

  • 主要介绍了土壤采集后混合样品单独样品制备过程,并根据不同分析项目采用不同粒径的过筛样品

    The preparation process of soil mixed samples and single samples is introduced. There is different grain size sample when there are different monitoring items.

    youdao

  • 文章以造林治沙项目阐述如何应用参与式社会经济评估方法发现和分析项目设计中的社会经济问题。

    Taking an afforestation and desertification project as a case, this paper illustrates how to apply participatory socioeconomic assessment to analyze socioeconomic factors in project design.

    youdao

  • 分析高职自动化专业英语教学特点现状,阐述项目式教学的内涵及意义,详细分析项目教学实施的原则。

    The characteristic and status of teaching of speciality English for automation major in vocational colleges have been analyzed.

    youdao

  • 通过分析项目跟踪与监控的实际实施情况本文提出该活动的一个完整的实施模型基于度量的SPTO过程模型。

    According to analyze the actual implementation situation, the paper proposes a complete implementation model: SPTO's process model based on measurement.

    youdao

  • 通过分析项目跟踪与监控的实际实施情况本文提出该活动的一个完整的实施模型基于度量的SPTO过程模型。

    According to analyze the actual implementation situation, the paper proposes a complete implementation model: SPTO's process model based on measurement.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定