在SOMA标识的现有资产分析阶段,将检查存在的任何现有资产,以确定是否可以按原样对它们进行重用。
During the existing assets analysis phase of SOMA identification, any existing assets that are present are checked to see if they can be reused as they are.
因此,分析阶段最终的错误可以尽早地检查到,而不用对开发规划造成什么大的影响。
Thus, the eventual errors of the analysis phase can be detected quite early, without any of the notorious impact on development planning.
我们做了大量工作来定义在分析阶段执行的各种检查,以及确定哪些检查是必要的,而哪些是可允许的。
A great deal of effort went into defining the kinds of checks that could be performed during the analysis phase and in deciding which of these checks should be required and which should be permitted.
本文以消防监督检查系统为实例,展示了UML在进行软件设计构造阶段中,设计阶段模型和需求分析阶段模型之间的依赖关系。
Using fire fighting supervising system as an example, this paper exhibits the dependency relations of design phase model and requirement analysis phase model in software build phase by UML.
本文以消防监督检查系统为实例,展示了UML在进行软件设计构造阶段中,设计阶段模型和需求分析阶段模型之间的依赖关系。
Using fire fighting supervising system as an example, this paper exhibits the dependency relations of design phase model and requirement analysis phase model in software build phase by UML.
应用推荐