• 采取工程测量控制,对冷却储存“S”形束流基础坑道采用全站极坐标进行高精度定位测控

    With the engineering survey control network, authors made a high precision orientation, measuring and control to basement, mine gallery wall of CSR beam loop by polar coordinates with total station.

    youdao

  • 兰州重离子加速器冷却储存工程(HIRFL CSR)主和实验带电粒子束流强度测量监视拟由束流变压器实现

    The intensity of a pulsed beam of charged particles in the Cooling Storage Ring Project of Heavy Ion Research Facility in Lanzhou (HIRFL-CSR) will be measured with a toroidal current transformer.

    youdao

  • 兰州重离子加速器冷却储存工程(HIRFL CSR)主和实验带电粒子束流强度测量监视拟由束流变压器实现

    The intensity of a pulsed beam of charged particles in the Cooling Storage Ring Project of Heavy Ion Research Facility in Lanzhou (HIRFL-CSR) will be measured with a toroidal current transformer.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定