不要简单地采用一种解决方案或者技术,相反,要仔细地规划和评估每个决策带来的后果。
Don't just drop in a solution or technology; instead, carefully plan and evaluate the consequences of every decision you make.
他们在制定决策方面只考虑少量的信息和评估少量方案。
They make decisions with minimal information and assessing few alternatives.
采用一种折中型模糊多属性决策方法对工程中的总体方案进行评估。
A compromise fuzzy multiple-attribute decision-making method for the evaluation of the program of works was introduced.
纵向分布模式映射了决策过程中问题提出、问题求解、方案评估和决策结果生成的串行求解过程。
The transverse hierarchy accords with the serial decision process of bringing forward decision problem, solving problem, evaluating project and bringing forward project.
本文研究了该系统方案选择中的决策分层、特征指标的确定、对策方案评估的模糊优选理论与模型、以及总结专家经验的模糊数学方法。
This paper does a preliminary approaches on decision making levels, evaluating feature indexes, fuzzy set method of summarizing the expert knowledge in the process of evaluating alternatives.
本文介绍铁泥石流防治方案的安全性评估及综合减灾决策技术。
The method for the safety analysis of debris flow prevention and control along railways and the technology of comprehensive decision-making for mitigating debris flow disasters are investigated.
具有作业天气预警、云场模拟预报、临近作业方案决策、作业动态监控指挥和作业效果实时评估等多种功能。
It has multiple functions such as operational weather warning, cloud field simulation and prediction, instant decision-making of operation...
建立的综合风险评估模型能够作为项目管理人员进行项目方案比选和决策的辅助工具。
The model established can be used as a assistant tools for the selection of project programs.
完成风险信息查询、灾害评估以及抢险与避难方案的设计等,并形成一套完整的风险管理与决策支持应用系统。
The flood risk map was used in risk information inquiring, flood evaluation, design of emergency and refuge plan to form an integrated system of risk management and decision-making.
本文就地震预报决策中有关决策目标的确定,地震预测,震害预测,地震对策,预报决策备择方案的制定及评估,决策方案的选择及实施等问题进行了讨论。
In this paper, some problems about the determination of decision objective, forecast of earthquake and its damages, seismic countermeasure, making and evaluating the reserve the plan about predi...
本文就地震预报决策中有关决策目标的确定,地震预测,震害预测,地震对策,预报决策备择方案的制定及评估,决策方案的选择及实施等问题进行了讨论。
In this paper, some problems about the determination of decision objective, forecast of earthquake and its damages, seismic countermeasure, making and evaluating the reserve the plan about...
通过建立待评估方案决策矩阵,构造理想方案。
By establishing a need evaluation project decision matrix, an ideal project is constructed.
通过建立待评估方案决策矩阵,构造理想方案。
By establishing a need evaluation project decision matrix, an ideal project is constructed.
应用推荐