• 景洪水电站主厂房右侧紧邻右底孔,右冲沙底孔作为二期纵向围堰组成部分厂房开挖前已经形成。

    In order to ensure the excavation of sediment discharge bottom outlet at right side and foundation of the power house dam section, the blasting method was used in Jinghong power station.

    youdao

  • 底孔闸门布置大坝中部靠下,承担大坝任务

    The bottom hole strobe arranged in dam middle, undertakes the dam to flush the sand duty.

    youdao

  • 底孔闸门布置大坝中部靠下,承担大坝任务

    The bottom hole strobe arranged in dam middle, undertakes the dam to flush the sand duty.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定