• 工程网络计划活动持续时间为已知的确定值时,关键路径证明一个网络计划的有效

    When the durations of activities in a planning network are precisely known, Critical Path method has been proved to be a effective method to make planning.

    youdao

  • 关键链项目管理传统项目管理方关键路径、计划评审技术的优势劣势进行了比较。

    Then analyze the advantages and disadvantages of the traditional scheduling management method by comparison, such as CPM, PERT.

    youdao

  • 根据关键路径串行调度原理,论述活动和后序活动时间参数计算以实例阐述了计算原理。

    According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.

    youdao

  • 一个项目中的大多数活动同以往执行过很多其他活动类似时,通常采用关键路径法CPM)进行计划编制。

    When most of the activities in a project are similar to other activities that have been performed a large number of times, CPM scheduling is generally used.

    youdao

  • 介绍传统调度的基础上,引进了关键路径自动生产调度上的运用介绍了关键路径法中的网络优化

    The paper introduces the traditional scheduling method, discusses the application of CPM on automatic production scheduling and introduces the network optimization method in CPM.

    youdao

  • 第三中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要(甘特关键路径法、计划评审技术等),并指出几种方优缺点

    Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.

    youdao

  • 我们初始瀑布项目中,我们有了一个关键路径我们的项目中的关键活动其它项目中的关键活动关联在一起。

    In our original waterfall project we had a critical path that aligned key activities in our project with key activities in their project.

    youdao

  • 关键路径进度识别控制项目故障后果关键设计结构矩阵连接关键链。

    Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking.

    youdao

  • 本文提出一种关键路径评价,在比较分析BCWPBCWS同时关键路径BCWP与BCWS作比较,以便更准确地把握项目进度情况

    It's brought forward an EVM evaluation method with critical path to hold the project progress well through comparing with BCWP and BCWS also with BCWP CP and BCWS CP in critical path at the same time.

    youdao

  • 关键路径进度识别控制项目故障后果关键设计结构矩阵连接关键链。

    Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking (PDF).

    youdao

  • 关键路径进度识别控制项目故障后果关键设计结构矩阵连接关键链。

    Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking (PDF).

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定