• 本文主要介绍公司二期工程制浆线工艺及控制设计方面的内容。

    This article introduces the pulping line and detail of the controlling design in the second-stage project of Vinda paper(Jiangmen) Limited Corporation.

    youdao

  • 2017年中期公司扩建即将完工,专业生产铝合金转向节控制

    By the middle of 2017, company phase two infrastructure will be finished, which aims to the production of aluminum alloy knuckle and control arm.

    youdao

  • 介绍中海石油化学有限公司化肥项目工程建设生产准备一体化各项管理工作实施成效

    Presents integrated management of engineering construction and production preparation of the second stage chemical fertilizer project of Fudao chemical co., as well as the execution efficacy.

    youdao

  • 分析了射阳港发电有限公司二期湿法烟气脱硫系统影响石膏浆液循环电耗的因素,提出有效的石膏浆液循环泵运行优化方法降低了脱硫系统的厂用电

    The effect of gas desulfurization system on gypsum slurry circulating pump is analyzed in the paper to provide effective optimization methods aiming at lower service power consumption rate.

    youdao

  • 通过对公司二期300MW机组自动发电控制(AGC)投入状态下DEB方式停磨分析,指出AGC投入状态下DEB方式时滑压定压两种不同状态下启停的参数调整及控制方法。

    In this article, with the analysis of the commitment mill in DEB way with the AGC is input in the second-stage 300 MW units of the company.

    youdao

  • 类似于Hedgebay Trading这样的公司已经在为对冲基金股份拓展二期市场了。

    Companies such as Hedgebay Trading have developed a secondary market for hedge-fund shares.

    youdao

  • 坐落美丽沿海滨——福建石狮市江镇,占地面积60亩,始建于1990年。 公司现有标准厂房18000多平方米,建筑面积达20000多平方米二期花园式工业园已破土动工,下辖休闲茄克、休闲裤五个生产基地,固定资产1.5个亿,是中国休闲之都——石狮的服装龙头企业。

    Situated in the Shishi, the beautiful coastal city, Baowei covers a area of 60 mu(40 000 square meters) with 18 000 square meters of workshop and 20 000 square meters of construction area.

    youdao

  • 公司成立初期规模只要5000多平方,但随着公司业务的日益扩展生产需求,我们的厂房正在筹建中

    Factory scope only 5000 square meters when initial of establish company, Second construction scope expanding now as sales expanding and production need.

    youdao

  • 位于龙岗区龙岗街道九州家园公司专业从事霍尔传感器研究开发销售

    Shenzhen Hall Microelectronics co., Ltd. is located in Longgang District, Longgang District, Kyushu home two streets, the company specializes in Hall sensor research, development and sales.

    youdao

  • 介绍齐鲁石化公司热电厂处理装置采用三室三浮动技术进行黄河水处理改造运行情况。

    The revamping of Phase 2 water treatment plant of three-cell three-layer floating bed process in the thermal power plant of Qilu Petrochemical Company and operation are described.

    youdao

  • 荷兰皇家壳牌公司中海油谈判参与惠州炼油厂二期工程

    Royal Dutch Shell Plc is negotiating with China National Offshore Oil Corp (CNOOC) to participate in the latter's Huizhou refinery's second-phase project.

    youdao

  • 集团公司下属的游艇俱乐部工程正在建设中。

    The second phase of international Yacht Club of our Group company are in building, which is managed as international rules.

    youdao

  • 中国石化齐鲁股份有限公司烯烃厂乙烯装置二期扩建首次制冷技术应用于工业生产,并取得成功

    Lummus technology of tertiary refrigeration has been applied successfully to the expansion of ethylene plant in Qilu as its first commercial application.

    youdao

  • 二期扩建工程采用DCS整个生产流程过程进行控制管理系统控制部分使用霍尼韦尔公司的HC 900 系列组成,上层监控组态软件选用山武公司CPA

    The DCS system is used to production process management and automation control for the whole production process, which is exploited in Yamatake's CPA System and Honeywell's HC900 DCS Controller.

    youdao

  • 大冶有色金属公司铜绿山矿工程地下开采接近尾声即将开展工程深部开采开拓。

    The second phase of underground mining of Tonglushan Mine, Daye Non-ferrous Metals Company, will be finished, and the third phase of deep mining is going to be carried.

    youdao

  • 介绍中海石油化学有限公司富岛合成氨装置燃气轮机烟道以及段炉风道烘炉过程,烘炉过程进行说明总结

    Presents the baking of the combustion gas turbine flue and Primary reformer air chute of the second stage ammonia plant in CNOOC Fudao Chemical co., Ltd., explains and summarizes the baking process.

    youdao

  • 珠海醋酸纤维有限公司24举行大会,庆祝扩建工程圆满完成公司成立十二周年

    Zhuhai Cellulose Fibers Co. , Ltd held a ceremony meeting for the completion of the 2nd phase and the company's 20th Anniversary on May 24th.

    youdao

  • 公司期工程流水线已正常生产,2010年底二期工程的两条流水线即将投产

    We have two production lines in operation. And another two production lines will put into production by the end of 2010.

    youdao

  • 美资盛基(嘉善)工业有限公司一、厂房20万、西子创业大厦二十九层全钢结构绿城足球俱乐部中泰训练基地网架

    US-owned Shengji (Jiashan) Industrial Co., Ltd. 1, 2 factory 20 thous square, West Venture Building, 29-layer full-steel structure, Greentown football club training ground grid so on.

    youdao

  • 美资盛基(嘉善)工业有限公司一、厂房20万、西子创业大厦二十九层全钢结构绿城足球俱乐部中泰训练基地网架

    US-owned Shengji (Jiashan) Industrial Co., Ltd. 1, 2 factory 20 thous square, West Venture Building, 29-layer full-steel structure, Greentown football club training ground grid so on.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定