是的,我们正在新建一个工厂。工程正处于全面施工阶段,三个月内就可以完工了。
B: Yeah. We're setting up a new factory now and the work on it is in full swing. The project will be completed in three months.
本文将从水电安装的各个分系统出发来全面分析高层建筑水电安装的施工要点。
This paper will start from various partial system of hydropower installation to fully analyze the key points of the construction of high-rise building hydropower installation.
1号线(黄岛段)也全面进入车站主体施工阶段。
Line No. 1 (Huang Daoduan) also entered the construction phase of the main station.
通过在施工中探索,全面了解砾石土的特性,摸索出砾石土施工方法和经验。
The characteristics of gravelly soil are understood entirely and the construction method and experience are found out through construction.
本文结合争创“钱江杯”工程为例,运用全面质量管理的观点,介绍了这一新型建筑材料的施工及质量控制措施。
As an example, this article combines project with "Qianjiang cup", introduces the construction and quality control measures to the new building materials with Total quality control point of views.
本文对砼桥梁裂缝的种类和产生的原因作较全面的分析总结,以方便设计与施工控制。
This paper for concrete bridge crack and the reason that produces are made than overall analysis summary, are controled with convenient design and construction.
建筑防水;全面质量管理;材料质量控制;设计质量控制;施工质量控制;g - TQM模式。
Building waterproof; total quality management; materials quality control; quality control of the design; construction quality control; G-TQM model.
对瑞华大厦的施工技术进行了全面阐述。
The construction technique of the building is also comprehensively explained.
就梅河高速公路高边坡设计问题作了较为全面的剖析,并对监测、施工等问题进行了探讨。
The problems for high wall slope design of Meihe expressway are analyzed comprehensively, and the problems in terms of monitoring and construction are also discussed.
利用这一评价结果,可以全面掌控整个工程项目施工现场的安全状况和安全管理水平。
Using the result of this evaluation, the safe situation and the safety management level of the whole engineering project can be all-round controlled in the building site.
经过较全面的计算分析研究,渡槽能够满足各种可能条件下的施工和安全运行要求。
After calculation, analysis and study in an all-round way, it shows that the aqueduct can meet the requirements of construction and safe operation under any possible conditions.
西气东输管道工程已全面正式开工,其管道施工现场质量保证和质量控制非常重要。
The project of West China gas transported to the east is already overall formally started, the quality control and the quality guarantee of pipeline construction on site are very important.
如何对成本、工期、质量和安全进行全面的优化和管理,是对施工项目目标集成管理所提出的又一挑战。
How to carries on the comprehensive optimization and the management of cost, time, quality and security, is another challenge to the integrated management of construction project objects.
目前对于施工一线的物料管理缺乏全面的研究。
Currently, the forefront of the construction materials management lacks a comprehensive study.
带领土建工程师进行施工过程全面管理。
Work together with the civil engineer to take overall management on the construction process.
在充分与客户的讨论过程中,我们将全面考虑施工费用,施工进度和质量控制等一系列问题。
Based on thorough discussions with the customer, we will take the factors of construction expense, construction progress and quality control into full consideration.
本文对挡土墙填土的种类及相应的土压力计算方法进行了全面论述,对现场施工具有指导意义。
This paper states types of retaining wall back fill and relevant earth pressure calculation method, which is of direction significance for cast-in-palace construction.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
我国乃至世界在沙漠公路的设计、施工、试验、检测等方面没有较为全面的规程和规范,以指导沙漠路基的施工。
There are not comprehensive specifications and criterions for the construction of desert roadbed in respect of design? experimention and test in our country even in the world.
本文就坝址选择及枢纽工程布置、混凝土面板堆石坝设计、施工和原型观测等方面进行了全面的论述。
The choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper.
目前,前期施工准备工程已全面展开,工程进展顺利,形势非常好。
At present, the overall preparation project for construction developed; the project advances smoothy; and the situation is very well.
对大型斜拉桥主塔基础钢围堰的制作、拼装、定位及下沉的施工测量作了全面论述。
This paper deals with the construction surveying of manufacture, installation, positioning and settlement of steel cofferdam of main towers foundation for a large cable bridge.
施工中可采用MPFC防治法,即对复合式地铁车站可从材料技术、预应力技术、纤维混凝土技术及施工保障系统出发进行全面防治。
MPFC method may be adopted for prevention in the construction, namely, to make full prevention for the station from respects of material, prestress, fiber concrete and construction guarantee system.
对混凝土桥梁产生裂缝的种类和原因进行了较全面的分析和总结,以便在设计、施工使用中找出控制裂缝的可行办法,达到防范于未然的作用。
The concrete bridge fracture sorts and produced cause are completely analyzed and summarized for finding out fracture control feasible methods in design and construction to take preventive measures.
笔者任职以来一直主持企业技术管理的全面工作,对工程项目施工组织设计文件接触较多。
I have been presiding complete work of enterprise technology management since I took the position and often touch files of engineering project construction organization designs.
主要对该线路高架桥的设计参数标准、材料、地质、设计特点及施工要点等作一全面分析论述。
For the viaducts of the line, a thorough description and analysis for the standard of design parameters, material, geology, main facts of design and construction is given.
全面掌握这些特征,无论对沥青混凝土心墙堆石坝的正确设计,还是合理施工,无疑都是有帮助的。
It is assuredly helpful to well know these characteristics for either proper design of rockfill dam with bituminous concrete core, or reasonable construction.
项目上,以项目经理为管理中心,全面推进施工管理和成本精打细算工作。
For each project, the project manager will be the central point for the management of the construction progress and exercise of cost control precisely.
项目上,以项目经理为管理中心,全面推进施工管理和成本精打细算工作。
For each project, the project manager will be the central point for the management of the construction progress and exercise of cost control precisely.
应用推荐