• 三个方面论述建设项目全过程造价控制工作。

    The paper discusses the full process control of the project cost from three aspects.

    youdao

  • 模式有益于全过程造价咨询企业实现有效知识管理

    This mode of engineering cost consultation enterprises can realize effective knowledge management.

    youdao

  • 介绍工程项目全过程造价控制意义阶段控制方法

    The paper exhibits the significance of whole-process cost control of engineering project and the control methods in each phase.

    youdao

  • 我国目前采用工程造价模式是以定额计价基础全过程造价管理模式。

    The project cost management model that we're applying now is Whole Process Cost Management model using the ration as the pricing basis.

    youdao

  • 最后构建全过程造价咨询服务体系进行综合评价方面提出了一些想法见解

    Finally, the paper puts forward some idea and advice on evaluating the constructed whole process of cost consultation service system.

    youdao

  • 论文电网建设工程项目研究对象,对全过程造价管理进行深入研究和探讨

    In the paper, we take advantage of power grid construction project as the research object, to study the whole process cost management.

    youdao

  • 我国加入WTO后面临着如何国际惯例接轨,进行全过程造价管理控制重要课题

    After our country join WTO, face how to BE in line with international usual practice, important topic that carry on the whole process to build the price management and control.

    youdao

  • 通过宏观法制框架微观企业自身资质对比分析全过程造价咨询业务流程再造可行性

    Then analysis the feasibility of business process reengineering of the whole process cost consultation operation by the comparison of macro-legal framework and micro-enterprise qualification.

    youdao

  • 本文轨道交通工程造价全过程管理进行论述,提出全过程造价制约概念阶段介绍如何进行制约。

    Whole process in this paper, the rail transit construction cost management, this paper puts forward the concept of the whole process of cost control, and introduces how to control in stages.

    youdao

  • 研究目标建设项目各个过程进行浅析浅析研究,基础上提出一些改善项目全过程造价管理策略。

    The goal in research is to analyze and research to each course of the construction project, and propose some improvement on this basis.

    youdao

  • [摘要]针对造价咨询业特点创建流程导向编码人本化动态组合全过程造价咨询知识管理模式模型

    Abstract: Based on the characteristics of cost consultation, this paper establishes a process-oriented, codification and personalization mode dynamic combination knowledge management model.

    youdao

  • 本文分析工程建设实施各个阶段如何有重点地控制工程造价后,指出目前实现全过程造价管理还存在的弊端以及发展前景

    This paper analyzes how to control engineering costs at various stage of engineering construction and indicates the abuse in that process and the prospect of development.

    youdao

  • 采取有效全过程工程造价管理控制关键

    Take the effective management of the whole process of the project cost control is the key.

    youdao

  • 工程造价控制贯穿整个工程建设全过程

    The engineering cost control, passes through in the entire process of engineering construction.

    youdao

  • 摘要市政基础设施项目建设工程造价控制管理贯穿于工程建设的全过程

    Abstract: : the control and management of the cost of construction of municipal infrastructure projects throughout the whole process of construction projects.

    youdao

  • 建设项目工程造价控制一个贯穿项目建设全过程复杂系统工程。

    The control of engineering cost of construction item is a complex system engineering that penetrates the whole process of construction.

    youdao

  • 通过实施全过程控制保证建设单位有效控制工程造价

    Thus, the efficient control of project cost for construction units can be guaranteed through implementing whole course control.

    youdao

  • 建设项目工程造价控制一个贯穿项目建设全过程复杂系统工程

    The control of the construction cost of the construction project is a complex system engineering that penetrates the whole course of the construction of the project.

    youdao

  • 本文结合工程造价管理经验,投资决策阶段设计阶段、施工阶段阐述了如何工程造价进行全过程控制

    The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.

    youdao

  • 基本建设造价控制注重全过程动态控制。

    The cost control of capital construction ought to lay stress on the dynamic control in the whole process.

    youdao

  • 工程造价控制贯穿整个工程建设全过程

    The project construction cost control passes through the entire engineering construction process.

    youdao

  • 文章通过工程造价全过程管理控制分析论述,找出工程造价全过程管理控制的重点内容主要方法等,旨在实现造价全过程控制。

    Through the analysis of the process management and control of construction cost, the article works out the focal points and contents as well as the main methods for this work.

    youdao

  • 建设项目的工程造价管理不再局限于事后结算延伸整个建设项目的全过程

    Construction cost management has been extended to the entire construction project and it is not confined to the settlement.

    youdao

  • 全面造价管理面向21世纪造价管理方法目前是集全过程要素、全风险团队为一体的造价管理。

    Total cost management is a method of cost management orienting the 21st century. At present, it consists of total process, total factor, total risk and total team management.

    youdao

  • 摘要本文主要如何加强工程监理全过程工程造价管理进行了阐述

    Abstract: : this paper mainly on how to strengthen the entire process of the engineering supervision of project cost management is discussed in this paper.

    youdao

  • 本文论述了工程造价控制主要问题详细分析工程项目造价全过程控制的重点

    This paper discusses the key issues of cost control, and detailed analysis of the whole process of project cost control focus.

    youdao

  • 论述工程项目造价控制贯穿于项目建设全过程,项目设计阶段则造价控制的关键环节

    The project cost control run through the whole course of construction, and the design stage is a key link.

    youdao

  • 完整有效地控制工程造价,应对影响工程造价三个阶段实施全过程控制

    For whole and effective controlling engineering cost it is needful to implement all process control to three sections of influence engineering cost.

    youdao

  • 完整有效地控制工程造价,应对影响工程造价三个阶段实施全过程控制

    For whole and effective controlling engineering cost it is needful to implement all process control to three sections of influence engineering cost.