• 记录好所有入井工具)外径

    Record all outside and inside diameters.

    youdao

  • 推荐钻头入井带一打捞

    Use of a junk basket on the prior bit run is recommended.

    youdao

  • 把管子状设备顶着压力压内。

    The action of forcing a pipe or tubular into a well against wellbore pressure.

    youdao

  • 化学推进剂被装工具,工具用钢丝绳下入井内。

    The chemical propellant is packed inside the tool which is lowered on wireline.

    youdao

  • 焊缝耐用性强能够满足恶劣的入井条件

    The single-seam weld is durable and withstands the toughest RIH conditions.

    youdao

  • 捞砂筒一个5英尺圆筒,它在大气压力内。

    The bailer is a 5-ft cylinder that is lowered into the well under atmospheric pressure.

    youdao

  • 可以用居中或者偏心方式下——操作弹性更强

    Works centered or decentered in the well – for extra operational flexibility;

    youdao

  • 电缆连接问题O形圈泄露导致射孔入井失败常见原因

    Wiring connection issues and leaking O-rings are among the most common causes of perforating gun misruns.

    youdao

  • 单一动作系统不同的是,多通路转喷器关闭位置的。

    Unlike single-action diverter systems, the multiple-opening diverter tool is run into the hole in the closed position.

    youdao

  • 提出经济实用自救接力紧急避险方法人员佩戴压缩自救器;

    The paper provided an economic and practical self-rescuer relay emergency refuge method. The personnel into the mine shall wear the compressed oxygen self-rescuer.

    youdao

  • 系统后,可以多种操作模式之间切换确保入井完成所有目标

    While deployed in the well, the system can be switched between multiple operating modes to achieve all of your objectives in a single run.

    youdao

  • 降低非生产时间(NPT)增加ESP系统可靠性入井工作时间最佳选择

    This was the best option to decrease non-productive time (NPT) and increase the reliability and run life of the ESP system.

    youdao

  • ,带班队长合适测量核实扶正器、扩眼器、钻头确保尺寸合适

    The Toolpusher or Senior Driller shall verify all stabilisers, reamers and bits will be gauged with appropriate ring gauge to ensure proper size before running in the hole.

    youdao

  • 现场快速测定形状不规则岩屑渗透率评价入井流体储层损害程度一个重要手段。

    On-site fast permeability detecting of non-regular shaped cuttings is very important for evaluating the formation damage degree caused by the invasion fluid.

    youdao

  • 瓦斯排放套管具有直径大、重量,在下入井过程,经常出现套管挤毁的现象

    Casings used in gas drainage Wells have large diameter and heavy weight, during the lowering process, compressive collapsing is an ordinary phenomenon.

    youdao

  • 套管主要原因套管扣加工质量不到规范要求以及套管管理不严造成

    The main reason that casing falls to the hole by breaking off thread is casing thread quality can't reach the criteria, and the management of casing running into the hole is not strict.

    youdao

  • 本文根据实践测试认为,供水过滤器直径长度确定,按“流速”计算合理

    It is deemed that choice of well screen 's diameter and length of a water well according to the inflow velocity to the well as did by some professional agencies traditionally is not reasonable.

    youdao

  • 套管补贴工具被下中,这时工具端部橡胶留在中的被割断套管顶部进行密封

    The casing-patch tool is lowered into the well where rubber or lead on the end of the tool is used to seal against the top of the cut casing remaining in the well.

    youdao

  • 鳖听了,就跟着里,怎知左脚进去,右脚已经绊住了,于是便从容地退了出来。

    The turtle went with the frog to the shallow well. Lifting his right foot, he tried to enter the well. But it got stuck even before he could extend his left one, so he leisurely retreated.

    youdao

  • 平常起下钻作业中,管柱依靠自身重量,不需要附加的向下载荷或者推力

    In ordinary stripping operations, the pipe falls into the wellbore under its own weight, and no additional downward force or pushing is required.

    youdao

  • 基地包括员工虹膜智能考勤计算机安全升级考试系列安全常识展示、电教化安全知识教育等。

    Iris Smart base including staff time and attendance, computer security upgrades well into the test, the series of safety knowledge display, audio-visual education of safety knowledge.

    youdao

  • 保护油气层室内评价工作主要借助于有关仪器,测定入井流体对油气层损害后渗透率变化情况。

    The laboratory evaluation for protection oil-gas formation is conducted mainly with related instruments to monitor the permeability change of the core.

    youdao

  • 无论从施工工艺入井材料室内评价检测手段还是优化设计评估技术达到国内领先水平

    Operating technology, running materials, laboratory evaluation and determination measures, optimal design and later evaluation technique, etc., have reached advanced level at home.

    youdao

  • 就位接头螺纹联结紧扣连接下内,回阀作为钻柱个接头。

    The landing is thread connected with stop ring and tightened on and put into downhole with drill string. The landing sub is used as a sub above drill string before check valve is run in downhole.

    youdao

  • 防止油层伤害最基本方法是做流体油层、原油、油层水配伍性实验,避免油层发生期望的变化

    In order to avoid change without expectation. we should do some compatibility experiments about well fluid , the oil layer, the crude oil and the oil layer water.

    youdao

  • 若将水泥浆下端封闭套管下内,泥浆环形空间,就能保证饱满的水泥浆。

    The slurries are injected into well before running in casings with closed bottom end and then running casing make the slurry be squeezed into annulus to improve cementing bonding in small annulus.

    youdao

  • 本文利用JHDS高温高压失水仪,在确定实验参数条件规定了评价各种入井流体油气损害程度模拟评价程序

    JHDS HTHP Dynamic Filtration Press is used to evaluate the damage to oil-gas formation according to specific simulation evaluation program for each kind of fluid under definite test parameters.

    youdao

  • 生产,生产单位可以在数据库中查询到各油田、区块敏感性评价结果采油工程流体配方以供现场应用

    In production, the production unit can inquire reservoir sensitivity evaluation result, fluid formula during entering about drilling and production engineering for field application.

    youdao

  • 他们水压()下,在岩石把水加热

    They pump water down an injection Wells (the blue well), where it is heated by the rock.

    youdao

  • 我们你的地经过,我们田间葡萄园不喝里的大道直到过了你的境界

    We will not turn aside into any field or vineyard, or drink water from any well. We will travel along the king's highway until we have passed through your territory.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定