• 通过对埋设于570中段光弹性应力计观测,分析中段矿柱破坏情况及原因

    The cause of mine pillar destruction in in Dachang Tongkeng Tin Mine was analyzed from observation by photoelastic stressmeter embedded in mine stope 570.

    youdao

  • 通过对埋设于570中段光弹性应力计观测,分析中段矿柱破坏情况及原因

    The cause of mine pillar destruction in in Dachang Tongkeng Tin Mine was analyzed from observation by photoelastic stressmeter embedded in mine stope 570.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定