研究了分段充填采矿法的动力学原理。
The dynamics principle of the sublevel mining method was investigated.
充填接顶是充填采矿法中重要的工艺环节。
The injection is an important process of filling mining technique.
高水固结尾砂充填采矿是一种新型充填采矿法。
Taking tails which are consolidated with high water material as backfilling is a new type backfilling method.
上向进路充填采矿法是一种具有广阔应用前景的采矿方法。
The upward drift stoping with backfill is a mining method with a widespread use future.
上向进路水砂充填采矿法是武山铜矿主要的采矿方法之一。
Upwards drift hydraulic fill mining is one of the main mining methods used in Wushan Copper Mine.
本文主要介绍了上向分段胶结充填采矿法在该矿的试验研究。
This paper introduced the test study of upward sublevel filling method in this mine.
针对上述主要问题,提出采用上向分条分层废石充填采矿法。
According to the problems above, the waste rock fill mining method with the upward slitting stratification is put forward.
推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。
The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.
在胶结充填采矿法中,选择一个恰当的水灰比是一件十分重要的工作。
In cemented filling method, to choose a proper water cement ratio is an important work.
为此,试验用盘区上向分层干式充填采矿法进行回采,取得了较好的效果。
As viewed form this, the panel upward horizontal cut-and dry filling method has been tried to use for this orebody mining, with a better results.
该采矿法指用台车凿岩、铲运机出矿和管道输送充填料的胶结充填采矿法。
The method discussed in this paper refers to the cut and consolidated fill method in which drilling is done by jumbo, broken ore moved by LHD unit and the filler transported by pipeline.
司家营常峪铁矿为控制采矿引起的地表岩移,采用地下开采充填采矿法采矿。
To control the surface movement caused by mining, the backfill mining method was adopted for underground mining in Sijiaying Changyu iron mine.
目前,使用充填采矿法的矿山日益增多,管道输送充填不接顶现象普遍存在。
At present, cut-and-fill method is adopted in a growing number of mines. However, it is quite common that stopes roofs are unable to be tight by pipeline transport in filling.
对高龙金矿下向分层进路胶结充填采矿法所用的充填材料进行了室内试验研究。
The indoor experiment on the filling materials used for downward slicing drift mining with cemented backfill in Gaolong Gold Mine was performed.
从地压管理和生产工艺过程方面分析了阶段充填采矿法的产生背景和划分依据。
The generation background and the classification principle of mass filling method are analyzed from the aspects of ground pressure control and production process.
胶结充填采矿法开采急倾斜矿体对地表的影响与其他采矿方法不同,有着自己的规律。
The impact on ground surface caused by cemented filling method when used for mining steeply inclined orebody is different from that by other methods and has its own law.
下向分层胶结充填采矿法是矿岩破碎、开采技术条件复杂的难采矿体最有效的采矿方法。
The underhand slice stoping with cemented filling is the most effective mining method for incompetant orebody with complicated mining conditions.
从分析冶金矿山充填采矿法开采的目的入手,探讨性地说明了相关的岩石力学分析过程。
Starting with analysis of goal of mining using back-fill method, the course of rock mechanics analysis is explained.
胶结充填采矿法安全性好、回采率高,为矿山技术进步、提高经济效益起到了积极作用。
The security of the stoping-cemented fill method is good and the rate of extraction is high. It has made the contribution for mine in technical progress and improving economic benefits.
本文以某矿为实例简要介绍了高浓度全尾砂泵压充填采矿法技术可行性研究的内容和方法。
In this paper, taking some mine as an example, the pump backfilling mining method with high density unsized tailings, as well as its investigation in technical feasibility are introduced.
针对采矿技术条件复杂的薄矿脉开采,推荐采用有钢筋混凝土护顶的下向分层充填采矿法。
The underhand slice stoping method, with reinforced concrete for roof support, is recommended to mine narrow veins where the mining technological conditions are very complicated.
陕西商州市金矿采用削壁充填采矿法开采急倾斜薄矿脉,获得成功,取得良好的经济效益。
Resuing is used for mining the steeply dipping narrow-vein in the Shangzhou Gold Mine of Shaanxi, has made great success and excellent economic effect.
本篇文章主要介绍了充填采矿法在海内外的应用现状及分类,并展望了这项技术的未来发展前景。
The paper mainly discusses the present application situation and classification of filling mining method at home and abroad and the development prospects of this technology.
简述了铲运机出矿的下向进路式水砂充填采矿法的主要技术特点和在武山铜矿北矿带的成功应用。
This paper describes main technical characteristics of underhand drift hydraulic sand filling method and its successful application at North Part of Wushan Copper Mine.
对充填采矿法应用于大中型黑色金属矿山进行了可行性分析,为在武钢程潮铁矿实施提供了参考意见。
The feasibility of the fill mining method in the large ferrous metal mine is analyzed in this paper.
以某地下铜矿为研究对象,研究了地表要求保护的前提下极破碎矿体的顶板再造上向分段充填采矿法。
Take an underground copper mine as studying object, on which the surface has to be protected, the mining method of sublevel filling method with roof reconstructing is studied.
云南锡业集团公司为提高矿产资源的利用率,针对不同开采技术条件的矿体,选用与之相适应的充填采矿法开采。
For increasing the utilization efficiency of mineral resources, Yunnan Tin Company Group Limited adopts the filling mining methods for different ore bodies.
青铜沟汞锑矿为充分开采井下资源,选择采用分段空场嗣后充填采矿法回采550~600m中段的部分残矿体。
To fully exploit the resources, Qingtonggou Mercury-antimony Mine adopts the sublevel open stoping with delayed filling to recover the remanent ore-body at the medium stage of 550~600 m.
结合某矿分段空场嗣后一次充填采矿法的多年实践,分析了充填接顶和采场脱水问题的产生原因,详细叙述了控制空场嗣后一次充填质量的改进技术。
Combining with several years experience on open stope backfill in one time, the causes of the problems were analyzed and some technique improvements were put forward.
接顶充填是该采矿法的关键技术之一。
Roof-contacted filling is one of the critical techniques for this mining method.
应用推荐