本文结合工程试验,应用有限元法分析了高大钢筋混凝土烟囱的定向倾倒过程。
In this paper, the process of directional collapse of high reinforced concrete chimney was discussed with finite element method, combining with engineering experiment.
二十多天后发现试验桩从水面消失,均为倾倒破坏。
After more than 20 days, it was found that test piles were disappeared in the water and tilting failure occurred.
二十多天后发现试验桩从水面消失,均为倾倒破坏。
After more than 20 days, it was found that test piles were disappeared in the water and tilting failure occurred.
应用推荐