监督公司的质量保证项目,并指导和管理中国的供应商质量工程师。
Oversee the company's quality assurance program and direct and supervise the company's China based Supplier quality Engineers.
与生产质量工程师,产品质量负责人,客户质量经理和供应商质量工程师保持密切合作,为产品质量改进提供支持。
Support product quality improvement with the close collaboration with Production quality Engineer, product quality Leader, Customer quality Manager and Supplier quality Engineer.
如果缺陷是在受gp - 12遏制的区域内发现的,供方应当提交表格i(或相当的)以及纠正措施计划给顾客的供应商质量工程师。
If a defect is found in GP-12 containment area, the supplier shall submit the I-chart (or equivalent) and corrective action plan to the customer's supplier Quality Engineer.
公司的工程师与供应商合作在保证质量的前提下尽可能地节约成本。
Its engineers collaborated with suppliers to extract cost-savings without compromising quality.
与工程一起,强化供应商质量和工程关系和工作实践。
Work with Engineering to strengthen Supplier Quality and Engineering relations and work practices.
组织质量、工程、物流等部门对供应商进行定期评估。
Organize supplier evaluation in certain period together with Quality, Engineering, Logistic.
和部品工程师一起审核/批准潜在的或者已存在的供应商,确保他们有好的质量保证体系。
Work with Qualification Engineer to audit/ approve potential or existing supplier, make sure they have good quality management system.
设计,工程,生产,质量,相关部门及供应商。
Design, Engineering, Production, Quality, Support Departments and Suppliers.
已核准核产品供应商名册由核质量保证(NQA)工程师负责控制和发放。
The approved nuclear vendor list is controlled and issued by the NQA Engineer.
团队工作:与产品,质量工程师,客户,生产人员,外部模具供应商以及销售人员一起进行模具设计和制造。
Teamwork: Working in conjunction with product and Quality Engineering, customers, production personnel, outside tool services and sales, on designs, manufacturing tooling.
本文阐述了机械工程材料的质量构成、质量控制的要求。提出了主机厂与供应商之间的“ERA”模型。
This paper describes the quality constitution of mechanical engineering material, require of quality control. To bring up "ERA" model of main engine factory between suppliers.
采购部门,定单管理部门,供应商质量管理部门,工程部门及其它相关部门人员和管理人员。
Purchasing department, procurement department, supplier quality assurance department, engineering department and other interactive department staff and management level.
工程质量主要是依靠事后的验收、整改等措施,质量控制过分依赖设计部门和设备供应商;
The project quality mainly depend on the measures of afterwards check and correct, and the quality control excessively relies on the design department and the equipment supplier;
工程质量主要是依靠事后的验收、整改等措施,质量控制过分依赖设计部门和设备供应商;
The project quality mainly depend on the measures of afterwards check and correct, and the quality control excessively relies on the design department and the equipment supplier;
应用推荐