• 此外易于设想情形,客户供应商生产部门质量控制”部门之间存在的方法分歧绝不会停止出现

    Moreover it is easy to imagine the divergencies of view which would not fail to arise between customers and suppliers and also between production and "quality control" departments.

    youdao

  • 负责车间供应商计划协调指导质量控制过程

    Plan, coordinate and direct quality control programs for own workshop and for suppliers.

    youdao

  • 确认供应商质量控制计划及其实施,确保供应商使用准确的检验方法推动供应商完成PPAP文件

    Supplier quality control plans verification, inspection method confirmation, and push the supplier to finish PPAP documents.

    youdao

  • 建立质量管理体系负责工厂供应商质量控制质量保证工作,确保客户提供符合质量要求的产品

    Set up quality control system, responsible for QC/QA in the factory and supplier's site ; provide qualified products to the customers.

    youdao

  • 本文阐述了机械工程材料质量构成质量控制要求提出了主机厂与供应商之间的“ERA模型

    This paper describes the quality constitution of mechanical engineering material, require of quality control. To bring up "ERA" model of main engine factory between suppliers.

    youdao

  • 介绍了一种现代汽车制造厂对零部件供应商进行质量控制先进管理模式包括零部件设计生产包装交付环节进行全面控制

    An advanced quality management mode for automobile component part supply is introduced, which includes the control over all process of design, production, packing, delivery, etc.

    youdao

  • AI全球领先产品质量控制服务供应商顶级国际品牌零售商建立合作关系。

    Ai is a global leading quality control and compliance service provider that partners with brands, retailers and importers around the world to secure, manage and optimize their supply chain.

    youdao

  • 质量控制部门供应商表现进行把关,把表现供应商报告生产经理

    Work with quality control to monitor and report poor supplier performance to PM.

    youdao

  • 质量控制质量管理供应商管理中扮演着越来越重要角色

    Quality control and quality management is representing more important role in supplier management.

    youdao

  • 工程质量主要依靠事后验收整改措施质量控制过分依赖设计部门设备供应商

    The project quality mainly depend on the measures of afterwards check and correct, and the quality control excessively relies on the design department and the equipment supplier;

    youdao

  • 工程质量主要依靠事后验收整改措施质量控制过分依赖设计部门设备供应商

    The project quality mainly depend on the measures of afterwards check and correct, and the quality control excessively relies on the design department and the equipment supplier;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定