基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
常规的模具制造工艺规划系统只是从工件的角度编制工艺,忽略了工件加工过程中的工序相关性,从而影响了车间作业优化调度的可行性和合理性。
In traditional processing, the technology is made according to the work piece and procedure relativity is ignored, so that feasibility and rationality are both affected.
常规的模具制造工艺规划系统只是从工件的角度编制工艺,忽略了工件加工过程中的工序相关性,从而影响了车间作业优化调度的可行性和合理性。
In traditional processing, the technology is made according to the work piece and procedure relativity is ignored, so that feasibility and rationality are both affected.
应用推荐