本文应用板壳理论,对渤海绥中36—1J区丛式井表层无钻井时间固作业方案进行了研究。
The paper, based on shell theory, studies the surface cementing operation scheme without drilling rig during cluster drilling in SZ 36 -1 J Area in Bohai Sea.
具有作业天气预警、云场模拟预报、临近作业方案决策、作业动态监控指挥和作业效果实时评估等多种功能。
It has multiple functions such as operational weather warning, cloud field simulation and prediction, instant decision-making of operation...
你也第一次被布置了家庭作业:(1)列个清单,通常引发孩子暴躁的导火线,(2)开始启动积极方案B解决问题。
You were also given your first homework assignments: (1) make a list of the triggers that are routinely causing explosions, and (2) start solving problems using Proactive Plan B.
对于相同用户注册中心方案,John可以向第一个基本节点提交作业,而不需要指定用户名和密码。
For the same user registry scenario, John may submit a job against the first base node without specifying user name and password.
作业假脱机就可以提供这种解决方案。
有一些可用的解决方案,但它们通常依赖于几个不同的、有时甚至是相反的组件协同作业。
There are solutions available, but they often rely on making several different and sometimes diverse components work together.
联邦优化器还使t - ETL解决方案更具有可适应性,因为当作业中数据特征发生变化时,最佳连接策略和链接顺序也可能随之变化。
The federated optimizer also allows the T-ETL solution to be adaptive, as the best join strategy and link ordering may change as the characteristics of the data in the job change.
审核施工作业的施工安全方案,保证安全设计到位。
Review the construction safety plans for construction work for safe work design.
这部分包含了这一设计作业以及一个由学生提出的方案。
This section contains the project assignment and one of the student projects.
根据排水管道的特殊作业环境,提出了穿缆机器人的总体方案。
Based on special working environment of sewer, the total robot project was put forward.
经过调研和反复现场勘察,确定的总体施工方案为:挖明沟排水,作业带晾晒,正常组对焊接,沉管下沟。
Therefore the general construction process scheme is worked out as follows: open trench drainage, work site dried in the sun, conventional butt welding, and pipe laid down into trench.
根据中试采矿模拟实验方案,运用机电一体化技术研制了一套作业模拟及动力学测试实验系统,并进行了系统软件和硬件设计。
A set of task simulation and kinetic measurement experimental system were built according to experimental scheme by use of mechatronics. Hardware and software of the system were designed.
最后,通过离散动态规划形成虚拟制造单元的生产作业调度次优可行方案。
Finally the static schedule in each virtual manufacturing cell is generated with discrete dynamic programming.
提出了换热器抽芯高空作业车抽芯工作台的设计方案。
A design scheme of the extracting core worktable of high-altitude working vehicle for heat exchanger was advanced.
小组透过一系列反复项目来作业的专案有可能属于较大型的专案或方案。
A project in which a team works through a series of iterations may be part of a larger project or program.
讨论了一种地理信息系统空间分析算法——最短路径分析,然后利用最短路径结果,采用表上作业法将灾害救援物资进行优化,给出最优调运方案。
Then it optimized the rescue supplies using form operation method based on the result of the shortest path, and selected the optimal transportation scheme.
分析了高硬度辊皮的磨损情况;改进了辊皮的切削方案;满足了生产需求并提高了作业率。
The wear conditions of high hardness roller sheet are analysed and cutting projects of roller sheet are improved.
根据分析结论,提出了在实际采矿作业中应采取解危方案和综合防治措施。
According to an analyzing conclusion, that some control schemes and synthetic prevention and control measures must be taken was put forward.
负责实施并执行生产项目的起重、吊装、装船等重大危险作业的安全方案程序,发现隐患立即整改。
Responsible for implementation of safety proposal and procedure for major hazardous operations such as lifting, lifting, shipment of production items, immediately correct if finding hidden danger.
根据免渡河站的作业实际情况,对小能力简易驼峰的改造方案进行了探讨。
According to actual operation condition of Mianduhe marshalling station, design of transformation for small capacity and simple and easy hump is explored.
承包人应根据监理工程师批准的施工方案或其后批准的修改方案完成开挖作业。
The Contractor shall, in accordance with the approved construction methods or the succeeding approved modification plans, complete the excavation operation.
该方案充分利用了有限的作业场地,节省了施工工期,创造了良好的社会效益和经济效益。
This scheme applies finite field sufficiently, saves construction period, and creates good social and economic benefits.
由于对顶板防水功能的要求很高,经多方案比较,决定选用初凝时间长、终凝时间短、利于大面积作业的高分子益胶泥防水技术。
Because the high demand on the waterproof function of roof high polymer easy plaster waterproof technology is chosen by several plans comparison.
同时根据整体模型的仿真分析,选择最优的铁路作业模式方案,并给出了集卡最佳配置数量。
And at the same time, according to the simulation analysis of the overall model, choose the best plan of railway operational model, and give the best number of container truck.
提出了新型换热器抽芯机——换热器抽芯高空作业车的设计方案。
Design scheme of extracting core machine for new heat exchanger was advanced-high - altitude working vehicle of extracting core.
该方案的确定将为快速腐熟秸秆还田联合作业机的设计、制造提供重要的参考依据。
This scheme will provide the important reference for design and manufacturing of the fast decomposition straw returning machine.
研究了多目标柔性作业车间调度问题,优化了设备分派方案。
Multi Objective Flexible Job-shop Scheduling(MOFJS) was studied, and equipment dispatch scheme was optimized.
研究了多目标柔性作业车间调度问题,优化了设备分派方案。
Multi Objective Flexible Job-shop Scheduling(MOFJS) was studied, and equipment dispatch scheme was optimized.
应用推荐