相反,管理员应该具有更好的操作控制,在停止逻辑作业时,基础结构将会停止正在并行运行的众多作业。
Instead, the administrator should have better operational control and stop the logical job, where the infrastructure would stop the many jobs running in parallel.
文章在介绍煤矿井下作业特点和煤矿井下用产品特点的基础上,论述了国家对煤矿用产品实行安全标志管理的重要性和必要性。
Based on the features of operation and products used in underground coal mines, the author described the importance and necessity of management of safety signs on products of mine use.
产品导向型作业分解是中心制造船模式下的运作方式的基础,关系到设计、制造和整个管理环节。
The core of center model operation method is the products-guiding jobdisintegration, which covers design, manufacture and whole management links.
ABC法是一个以作业为基础的科学信息系统,它不仅是一种成本计算方法,更是一种成本管理的思想。
ABC method is a scientific information system based on operation. It is not only a way concerning cost calculation, but even a thinking of cost management.
在现在这个技术驱动型的商业环境中,现代科技知识的管理理念和最佳实践为有效的工作业绩打下了基础。
Knowledge of modern technology management concepts and best practices provides the foundation for effective job performance in technology-driven business environments.
葡萄牙铁路基础设施管理局所做工作业绩:在葡萄牙,新铁路设备的制造以及对火车车厢的检测。
Refer - Portuguese railway infrastructure authority WORK PERFORMED: New railway equipment fabrication and inspection of railway cars, PORTUGAL.
葡萄牙铁路基础设施管理局所做工作业绩:在葡萄牙,新铁路设备的制造以及对火车车厢的检测。
Refer - Portuguese railway infrastructure authority WORK PERFORMED: New railway equipment fabrication and inspection of railway cars, PORTUGAL.
应用推荐