• 采用进化策略求解静力荷载作用拱坝体型优化设计数学模型

    The shape optimization design model for an arch dam under the action of static loads is dissolved by using the evolution strategy.

    youdao

  • 泄洪建筑物体型优化后,减轻冲刷有利于能防冲;

    The optimization of flood releasing structure pattern will reduce scour below dam and favour water energy dissipation and scour prevention.

    youdao

  • 介绍了峡口水利水电枢纽工程技施设计阶段坝基开挖线拱坝拱坝体型优化设计成果

    The optimization design results of the dam base excavation outline and the type and body shape of the arch dam of the Xiakou Hydraulic Project are introduced.

    youdao

  • 方法最大优点在于前处理简单运用复杂边坡室的快速开挖仿真体型优化分析中。

    The biggest advantage of the method is that the preprocessing is very simple; and it can be used in the excavation simulation and shape optimization for complicated slopes and caverns.

    youdao

  • 建立了计算设施水力特性数学模型挑坎掺气槽坎高优化目标函数原型掺气槽的体型优化进行了研究。

    In this paper, a mathematical model for calculating the air demand of the aerator is established, and the target mathematical function for optimizing the shape of the aerator is proposed.

    youdao

  • 基于有限元计算软件ANSYS,结合工程实例利用参数化设计语言APDL拱坝等效应力应用应力约束,进行拱坝体型优化设计

    With the ANSYS software and practical project example, the equivalent finite element stresses is applied in stress restriction for the shape optimization of arch dam by using APDL.

    youdao

  • 通过模型试验研究利用施工导流洞优化调压体型可行性

    This paper researched the feasibility of using construction diversion tunnel to optimize the figure of tail surge tank by model test.

    youdao

  • 从而优化体型相位延迟消色差性,扩大材料选取范围提供理论指导。

    So the theoretical basis is provided for optimizing achromatism of the rhomb-type retarder and the material selecting scope can be extended.

    youdao

  • 结合具体工程通过多种体型方案比较提出加设墩头优化方案同类工程设计、修建起到了一定的参考作用。

    By comparing several bodily form schemes and combining a project, the optimizing scheme that a circular pier guide wall is set in the front of the pier is put forward.

    youdao

  • 拱坝体型优化设计中,传统的经济指标目标函数数学模型一定局限性

    In the arc DAMS optimization, the used mathematical models with the economic norms as their objective function have some extents of limitations.

    youdao

  • 优化二级消力池体型已经运用工程设计中。

    Optimized shape of the second stilling pool has been applied to engineering design.

    youdao

  • 本文阐述了新型热水型吸收式冷水机组,即热水阶一体型吸收式冷水机组,对其原理、热力计算优化等作了详细介绍。

    This paper introduced a new hot-water absorption chiller, the two-stage integral chiller, specially designed for combined cooling, heating and electric power generation.

    youdao

  • 针对阳江抽水蓄能电站溢流坝具有水头坝址河床狭窄、坡度陡峭特点,通过水力模型试验研究优化了溢流坝及其消体型,解决了溢流坝的消能问题。

    The upper reservoir overflow dam of Yangjiang pumped storage power station shows the characteristics of high waterhead, narrowing river bed in dam site and steep slope.

    youdao

  • 针对阳江抽水蓄能电站溢流坝具有水头坝址河床狭窄、坡度陡峭特点,通过水力模型试验研究优化了溢流坝及其消体型,解决了溢流坝的消能问题。

    The upper reservoir overflow dam of Yangjiang pumped storage power station shows the characteristics of high waterhead, narrowing river bed in dam site and steep slope.