• 南京市秦虹大桥部分承台深水基础位于泄洪河道中,处于既有市政桥梁基础附近

    The partial low pile cap deep water foundations of Qinhong bridge are located in the flood discharge channel and near by existing civil bridge foundations in Nanjing.

    youdao

  • 作者在编制《钢筋混凝土通用图集过程中,发现桩承台高度合理确定需要进一步探讨。

    But in course of compiling Common Design Atlas for Reinforced Concrete pile caps, it is found that the reasonable height of two pile caps need to be discussed.

    youdao

  • 对于必须考虑作用本文的计算结果很有价值的。

    The effect of SFRC on mechanics behavior of thick pile caps has also been analyzed systematically in this paper.

    youdao

  • 本文考虑—土共同作用,根据位移协调条件,在高承台沉降计算方法的基础上提出考虑承台分担荷载作用承台基沉降计算方法。

    So based on the condition of displacement coordination, a method which can consider the effect of the cap sharing the load to predict the settlement of pile groups with low caps is advised.

    youdao

  • 本文考虑—土共同作用,根据位移协调条件,在高承台沉降计算方法的基础上提出考虑承台分担荷载作用承台基沉降计算方法。

    So based on the condition of displacement coordination, a method which can consider the effect of the cap sharing the load to predict the settlement of pile groups with low caps is advised.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定