特别地,团队可以估计三个值——最低、标准和最高估计值——交涉去掉了风险,并且应用这些值重新估计项目方差。
In particular, the team can estimate the three values — lowest, nominal, and highest estimations — assuming that the risk was removed, and then apply these values to reestimate the project variance.
实时估计出系统噪声方差矩阵和量测噪声方差矩阵,对状态变量进行灰色聚类,并对滤波矩阵和增益矩阵进行实时自适应调整,计算出状态向量的递推估计值。
Based on real-time estimation of noise matrix and grey clustering of state variable, filter or gain matrix is modulated so as to get an estimation of the state vector.
实时估计出系统噪声方差矩阵和量测噪声方差矩阵,对状态变量进行灰色聚类,并对滤波矩阵和增益矩阵进行实时自适应调整,计算出状态向量的递推估计值。
Based on real-time estimation of noise matrix and grey clustering of state variable, filter or gain matrix is modulated so as to get an estimation of the state vector.