• 汇总各单个活动工作细目估算费用制定费用基准所必需过程

    This is the process necessary for aggregating the estimated costs of individual activities or work packages to establish a cost baseline.

    youdao

  • 以下列出得建造安装DCS系统中央控制室的估算费用包括地方税费

    Listed below are estimated costs of constructing the CCR (central control room) for DCS, including local taxes.

    youdao

  • 属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用监视控制

    The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.

    youdao

  • 请了三家建筑公司估算修理房屋费用

    I asked three building firms to estimate for the repairs to the house.

    youdao

  • 建筑工作费用完全估算出来,高达几百万美元

    The building work has not been fully costed but runs into millions of dollars.

    《柯林斯英汉双解大词典》

  • 估算这些提案所涉及的费用吗?

    Have you costed out these proposals yet?

    《牛津词典》

  • 世卫组织完成行动计划尚未敲定内容,估算行动计划所涉费用

    WHO will finalize the outstanding components of the plan of action and estimate the cost implications of the plan.

    youdao

  • 我们要求营造估算一下修理天花板费用

    We asked our builder to estimate for the repair of the ceiling.

    youdao

  • 估算只有5%左右纽约开车进入曼哈顿,这些驾车人支付一半而那些住在郊外通勤人员商务用车支付另一半。

    By his reckoning, only 5% of New Yorkers commute to Manhattan by car. Those drivers will pay about half the fees, suburban commuters and commercial vehicles the rest.

    youdao

  • 现场支持人员单击这个任务输入估算费用位置7

    Field support clicks on the task and enters values for the estimated cost and the location as shown in Figure 7.

    youdao

  • 那么为什么马科斯和卡巴约估算费用威尔逊高出这么呢?

    So why is the cost estimate so much higher than Wilson's?

    youdao

  • 这项议案中的专项拨款所需费用做出的估算不同

    Estimates of the cost of "earmarks" in the legislation vary.

    youdao

  • 2010年初,安桌设备重要销售商HTC同意微软支付专利使用费用估算台手机支付5美元)。

    In early 2010 HTC, one of the leading vendors of Android devices, agreed to pay royalties to Microsoft for the use of its patents ($5 per device, according to some estimates).

    youdao

  • 最后一点,我们还无法估算,要将颗死气沉沉的行星变成地球一样的绿色星球到底会花费多少费用

    It didn’t estimate thecost of gardening a dead planet.

    youdao

  • 对于此类案件,一些所进行费用估算另一些所则“混合收费”,即按时收费固定收费结合

    Some firms provide upfront estimates, whereas otherscharge a “blended fee” based on a combination of hours worked and a fixed fee.

    youdao

  • 的士费用估算网站,提供美国加拿大境内城市城市的士费用估计

    An easy to use taxifare estimator that predicts the cost of a taxi from one destination to the next inside major US and Canadian cities.

    youdao

  • 已经估算这次旅行费用

    I have figured out the expense of this trip.

    youdao

  • 他们费用估算没有通货膨胀考虑在内

    Their estimate of the cost takes no account of inflation.

    youdao

  • 费用估算

    My estimate of the cost was wrong.

    youdao

  • 收回创始费用外加估算利息

    recovering the initial outlay plus imputed interest.

    youdao

  • 所有任务将被列入一个细致清单,所有的材料采购必须提前进行,当然,这些工程采购的费用也将被估算出来。

    These are detailed lists of all the tasks that must be completed, the materials that must be purchased and the cost estimates for each.

    youdao

  • 解决问题,研究了灰色组合模型发动机研制费用估算中的应用

    This paper suggests Gray combined Model should be used in estimating the Engine Development Cost so as to solve the problem mentioned above.

    youdao

  • 利用最近SEER -医保关联数据估算每年费用包含了2006年前65岁以上、确诊肿瘤的获益者索赔

    Annualized net costs were estimated from recent SEER-Medicare linkage data, which included claims through 2006 among beneficiaries aged 65 years and older with a cancer diagnosis.

    youdao

  • 费用导向的建设项目计划控制侧重包含最终成本估算内的成本项次。

    Expense oriented construction planning and control focuses upon the categories included in the final cost estimation.

    youdao

  • 我方根据所提供信息估算注销程序所需要时间费用

    The estimated duration and cost of winding up will depend on the details provided to us.

    youdao

  • 批准变更请求可能改变项目范围、项目质量费用估算项目进度

    Approved change requests can cause a change to project scope, project quality, estimated costs, or project schedule.

    youdao

  • 最终确定了两精馏塔设备参数验证设备费用估算

    Finally, equipment parameters were determined and the estimate of equipment expense was confirmed.

    youdao

  • 这种情况下需要判断核心问题什么并且做出费用进度方面的估算

    Determine what the core problems are and make an estimate regarding costs and scheduling.

    youdao

  • 这种情况下需要判断核心问题什么并且做出费用进度方面的估算

    Determine what the core problems are and make an estimate regarding costs and scheduling.