结合大型电厂开展设备优化检修的需求,对真空断路器状态监测与诊断系统进行了研究。
According to the needs for optimal maintenance of equipment in the power plant, the condition monitoring and diagnosis system of vacuum circuit breaker is studied.
有时我们不止需要帮助进行故障检修或优化的内容,而有时我们只是需要更多详细信息。
Sometimes we need to do a bit more than that to help us troubleshoot or optimize. Sometimes we just need more detail.
第五章将第四章的改进策略应用于配电网设备检修计划优化模型的求解。
The fifth chapter applies the improved strategies of the last chapter to the distribution devices maintenance scheduling optimal model.
重点介绍了具有邹县发电厂特色的优化维修模式和设备状态诊断管理,可供计划实施状态检修的发电单位参考。
It states optimized maintenance model and management of the plant, which would be good references to other plants to proceed condition-based maintenance.
本文在研究检修计划问题的内在特点基础上,建立了基于整数规划的检修计划优化模型和算法。
Based on the research of the internal features of maintenance scheduling problem, this paper establishes its integer programming based optimization module and algorithm.
本文针对杭州市电力局的需求,完成了一种电网检修计划安排与优化系统的设计和开发工作。
At the demand of Hangzhou Electric Company, this paper accomplishes the design and development of an optimization system for power grid maintenance scheduling.
并结合太钢目前现有的检修条件及运输特点,采用SWOT矩阵的分析方法对太钢自有铁道车辆的检修方式进行了优化选择。
Combining the repair condition and transport characteristic at TISCO, the repair mode was optimized by taking SWOT matrix to railway wagon at TISCO.
在检修流程方面,分别以时间,资源利用,项目实施质量作为评判依据,进行分类别的精益优化。
All items in the maintenance project process are classified to be leaned and optimized according to the judging criteria of time, resource utilization, project implementation quality.
在检修过程中采用补焊堵漏技术并进行水压试验,同时优化工艺操作条件,很好地解决了再沸器的内漏问题,延长了再沸器的运行周期。
The repaire welding, hydraulic testing and optimization of operating conditions have solved the leaking problems and extended the operating cycle of the reboiler.
对东北地区某供电局某一周的检修计划进行优化计算的结果表明:本文所提出的检修计划模型和算法以及静态安全分析中应用的相关算法和指标是正确而有效的。
The proposed model and method of maintenance schedules and static safety analysis are applied to a practical system, and numerical results verify the correctness and validity of them.
首先优化年度检修计划,而月和日运行计划则在年度检修计划的基础上,以系统可靠性和运行费用为目标进行优化。
The annual ms is optimized first, and the monthly and daily operation scheduling problems are then optimized on the annual ms with the aim of minimizing the risk and operation costs.
通过数值模拟方法对放空洞检修闸收缩段和龙抬头竖弯段进行了优化。
Based on the numerical simulation, the check gate contraction section and the vertical-curve section of the emptying tunnel are optimized.
这种优化方法由相互关联的三部分组成:发电机组的年度检修计划、月和日的运行计划。
This optimization approach consists of three parts: The annual MS, the monthly and the daily operation scheduling of power systems.
检修报告-我们的“终极”报告,该报告分析了搜索引擎优化因素,其中包括广泛的页因素,反向链接,内容,关键字,社会媒体,构件,竞争对手等等。
Overhaul Report - Our "ultimate" report which analyzes a broad spectrum of SEO factors, including on-page factors, backlinks, content, keywords, social media, widgets, competitors and more.
检修报告-我们的“终极”报告,该报告分析了搜索引擎优化因素,其中包括广泛的页因素,反向链接,内容,关键字,社会媒体,构件,竞争对手等等。
Overhaul Report - Our "ultimate" report which analyzes a broad spectrum of SEO factors, including on-page factors, backlinks, content, keywords, social media, widgets, competitors and more.
应用推荐