使编译线程以低于RT任务的优先级操作,并且作出了调整以避免生成带有严重的不确定性性能影响的代码。
It makes the compilation thread operate at a lower priority than RT tasks and is tuned to avoid generating code with severely nondeterministic performance effects.
GC暂停的不确定性影响将严重破坏RT应用程序在特定时限内完成任务的能力(请参见垃圾收集)。
The nondeterministic effects of GC pauses wreak havoc on an RT application's ability to complete tasks under specific deadlines (see Garbage collection).
这意味着除了将你的任务具体化以外,减少有关如何进展的不确定性因素也非常重要——并且,在该行动的时候,减少可能使你分心事物出现。
This means that in addition to making your task concrete, it's important to reduce the uncertainty about how to proceed-and, when it's time to act, to reduce available distractions as well.
并行程序中的不确定性给任务调度带来了困难,采用动态调度的方法有时开销很大。
The nondeterminism in parallel programs brings many difficulties to the task scheduling in which the dynamic method has high overhead.
设计进程和设计基础支持系统的选择也有赖于设计任务中的复杂性与不确定性特点。
Selecting design procedure and basic supporting system are also based on the complexity and uncertainty of the design task.
一个机器人关于它的任务和环境常常只有不确定的信息,所以研究不确定性知识表达和推理很具有现实意义。
Because environments usually have uncertainty information, the research of uncertainty knowledge presentation and inference is very provided with practice.
处理图象分析中的不确定性也是专家系统不可回避的任务。
It is an inevitable task for expert system to deal with uncertainty in image ana lysis.
它是一个具有设计任务并发执行和设计过程动态不确定性特点的复杂过程。
It is a complex process in which the design tasks will be concurrently implemented and the design process will be dynamic and uncertain.
采用时间预测的方法,可以较好地解决任务执行时间不确定性所带来的影响,为不确定环境下的实时调度系统提供一种很好的参考解决方案。
The time prediction method resolves the problem of uncertain execution times and provides a reference solution for real-time scheduling systems in uncertain environments.
这一任务需要欧洲央行和成员国的批准,“这意味着其效力的极大不确定性,”他说。
This mandate requires approval from the ECB and member states, "which implies significant uncertainty as to its effectiveness," he said.
在两个实验中使用比例控制范式,研究了基于空间位置的注意定势及时间不确定性对检测任务中IOR出现时程的影响。
This research used the proportion control method to explore the effects of attention set and time uncertainty on the time course of spatial IOR.
机器人需要完成更加复杂多变的任务,其工作环境也有极大的不确定性。
Robots need to complete more complex tasks, and their work environment is also very uncertain.
在与PM的经常的对话中,我听到了关于在RUP项目上应用项目管理任务的不确定性和犹豫。
Frequently in my conversations with PMs I hear uncertainty and hesitation regarding the application of project management tasks on RUP projects.
针对这一实际问题,提出了一种考虑任务工时不确定性的前摄性车间调度算法。
To deal with this problem, a proactive scheduling algorithm with uncertain processing times was proposed herein.
针对这一实际问题,提出了一种考虑任务工时不确定性的前摄性车间调度算法。
To deal with this problem, a proactive scheduling algorithm with uncertain processing times was proposed herein.
应用推荐