• 主要阐述了含水层人工挖孔施工工艺

    Article mainly elaborates on aquifers artificial dig-hole pile construction craft!

    youdao

  • 通过对人工施工技术探讨,阐明了人工挖孔桩施工质量控制以及安全控制要点

    In this article, the author discusses construction techniques of manual pore excavation piles, and states key points of construction quality control and safety control of manual pore excavation piles.

    youdao

  • 论述人工挖孔不利地质条件下施工方法技术措施

    The construction methods and technical measures of the artificial digging pile are discussed under disadvantageous geologic condition.

    youdao

  • 人工挖孔灌注高层建筑常用一种基础形式施工质量好坏直接影响到建筑的结构安全

    Usually the poured pile by artificial excavation expanding bottom is one foundation pile style of tall building, whose quality can affect the structural safety of the construction directly.

    youdao

  • 本文人工灌注设计施工经常遇到的问题进行论述,并提出解决的办法。

    This paper discusses some cautions at manual hole-digging and pile-pouring Designing and construction, puts forward some resolvents thereto.

    youdao

  • 山区公路桥梁人工灌注常见施工方法技术简单易于掌握具有十分广阔应用前景

    The artificial dig hole perfusion stake of coteau road's bridge is one of the common construct method, which has the merits such as simple technology, easily mastery, and has wide prospect.

    youdao

  • 直径人工挖孔具有单承载力质量容易保证,容易于施工等优点,工程中已得到日益广泛的应用

    The large diameter manpower excavation pile is used widely in project for its high bearing capacity, reliable quality and easy construction.

    youdao

  • 人工挖孔灌注一种经济实用具有承载力、灵活性施工噪音小、振动等特点

    The manual digging pile is an economical and practical type of pile with the properties of high bearing capacity, great flexibility, low noise and no vibration of construction, etc.

    youdao

  • 通过工程实例介绍扩大人工灌注施工方法质量保证措施

    Based on the engineering practice, this paper introduced constructional technique and quality assurance measures of big bore hole digging and pouring with expansion pile head.

    youdao

  • 人工现代建筑主要基础类型之一,而流沙是孔桩施工棘手问题

    The artificial hole piles are one of most foundation types in the modern construction, The problems on water inflow and soil flow are most troublesome in the construction of hole piles dug by man.

    youdao

  • 文章主要介绍监理工程师人工挖孔灌注施工过程质量控制

    This article mainly introduces quality control based on supervising engineer in course of the construction about the poured pile by artificial excavation expanding bottom.

    youdao

  • 吸反循环钻扩底灌注人工挖孔灌注相比,地质条件适应性强施工安全可靠

    Compared to artificial digging-hole pile, the pumping reverse-circulation under-reamed bored pile has higher adaptability to geological condition, and its construction is safety and reliability.

    youdao

  • 介绍人工灌注施工工艺流程详细阐述了人工挖孔灌注施工方法

    This paper introduces the construction process flows of the hand-dug filling piles, and expounds the methods for the construction of he hand-dug filling piles.

    youdao

  • 本文介绍人工几种克服流现象的措施,可供工程施工参考借鉴。

    In this paper some measures for controlling running sand during artificial digging hole pile construction was introduced, they can be used as reference to engineering construction.

    youdao

  • 工程基础原设计采用人工灌注根据施工出现实际情况,又采用压力注浆技术取得了良好效果

    According to the condition in the construction, the technique of pressure grouting of pile tip was adopted and obtained well effect.

    youdao

  • 介绍人工护壁钢筋制作安装混凝土浇灌施工过程

    An introduction is made on the construction process of artificial hole pile including holing, wall protection, fabrication and installation of reinforcing cage, pile core concrete grouting etc.

    youdao

  • 针对人工特点叙述施工注意安全技术措施

    In view of digs Kong pile artificially the characteristic, the safety work measure which in the narration pile construction should pay attention.

    youdao

  • 针对人工灌注施工时遇到问题流沙淤泥质地下水岩石等总结一些解决办法

    In view of the problems encountered in the construction of pile setting by grouting man dug hole, such as flowing sand, silty soil, underground water and rock, some solutions are summed up.

    youdao

  • 高坡土墙施工采用人工挖孔,并结合逆作法钢筋混凝土墙板的方法,具有无需土方大开、无需支撑、施工安全和节约基建投资等优点。

    In the construction of retaining wall with steep slope grade, manual hole digging piles are adopted in combination with reverse working for ramming reinforced concrete wall panel.

    youdao

  • 设计拟建沈阳地铁沈阳站点人工挖孔支护施工基坑降水方案

    The thesis designs the pit dewatering scheme of hand-dug piles support of ShenYang subway's ShenYang station construction;

    youdao

  • 设计拟建沈阳地铁沈阳站点人工挖孔支护施工基坑降水方案

    The thesis designs the pit dewatering scheme of hand-dug piles support of ShenYang subway's ShenYang station construction;

    youdao