• 当地下条件好时,人工挖孔通过合理简化将其嵌岩灌注物理模型简化端承,暂考虑上部阻力

    If the geology condition is better, the physical model of man_dug pile can be regarded as end_bearing pile by reasonable simplification without considering the friction resistance of the soil.

    youdao

  • 工程基础采用人工孔嵌灌注采用预应力平板楼盖,塔楼采用混凝土结构

    Artificial pile foundation set into rock, skirt building with prestress plane floor and tower building with steel reinforced concrete (SRC) structure are adopted in the project.

    youdao

  • 对于嵌岩人工灌注本文提出根据土质条件多节扩头,即沿身设置若干个设想,对于提高承载力,具有显著的技术经济效果。

    In this paper, a new idea of increasing the load - bearing capacity of single pile is presented for non -rock -inlaid manual digging pile.

    youdao

  • 对于嵌岩人工灌注本文提出根据土质条件多节扩头,即沿身设置若干个设想,对于提高承载力,具有显著的技术经济效果。

    In this paper, a new idea of increasing the load - bearing capacity of single pile is presented for non -rock -inlaid manual digging pile.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定