• 出货以及完善的物流体系,确保产品完好准时交付到您的手中。

    The ex-factory final inspection and well-developed logistics will ensure prompt and damage-free delivery of products.

    youdao

  • 超过储存期成品出货前成品产品型号类别各抽查一发现问题时,

    The storage period of more than 5.5 of the finished product, shipment of finished final inspector to product models and types of the sample set, if discover a problem, want to open package inspection.

    youdao

  • 超过储存期成品出货前成品产品型号类别各抽查一发现问题时,

    The storage period of more than 5.5 of the finished product, shipment of finished final inspector to product models and types of the sample set, if discover a problem, want to open package inspection.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定