3制造——这是个制造的步骤。附表活动所必需的生产,测试,包装和准备交货。
Make - This is the manufacturing step. Schedule the activities necessary for production, testing, packaging and preparation for delivery.
准备和提交项目相关文件,即,生产进度表,以证明符合客户的交货时间表的要求。
Preparation and submission of project related documents i. e. production schedules to demonstrate that clients delivery schedules are being achieved.
例如,Component1可以是订单准备组件,method2可以是决定交货期的方法,method3可以是决定价格的方法。
For example, Component1 could be an order-preparation component, method2 a method to determine lead times, and method3 a method to determine prices.
讨论了工件准备时间、加工时间和交货期都为随机变量的单机调度问题。
This paper is concerned with single machine stochastic scheduling problems with random ready times, processing times and due dates to minimize the number of tardy jobs.
而对于交货和包装的提前准备对港口柔性的影响较小。
Preparing for delivery and packaging is the least contribution to flexibility of ports.
在其他情况下,当货物在卖方的运输工具上准备卸货而交给买方指定的承运人或其他人处置时完成交货。
In any other case, when the goods are placed at the disposal of the carrier or another person nominated by the buyer on the seller's means of transport ready for unloading.
询价处理:准备和核对报价,提供最小订购量,交货期等,制订报价单。
Inquiry treatment: prepare and provide a minimum order, check quotation, delivery date and other, formulate the quotation.
讨论了工件准备时间、加工时间和交货期都为随机变量的单机调度问题。
This paper considers the open shop scheduling problems with job priorities and release times.
讨论了工件准备时间、加工时间和交货期都为随机变量的单机调度问题。
This paper considers the open shop scheduling problems with job priorities and release times.
应用推荐