部分荷载时,双压机交替运行,寿命更长。
Part of the load, the double-press alternately run and longer life.
通过对钢筋混凝土梁进行不同荷载等级下静载和动载的交替实验,得到混凝土梁从完整到破坏的频率变化规律。
The alternate test of static load and dynamic load on RC beam serves the study of the frequency change disciplinarian from integrity to destroy of RC beam.
试验分析了荷载和干湿交替环境共同作用下CFRP -钢界面破坏特征、极限荷载影响和破坏机理。
The ultimate bear capacity, the failure characteristics of the CFRP and steel interface are studied after long term loading and dry-wet cycling.
将在交替变换荷载速率试验中得到的对应于低荷载速率的应力–应变曲线沿着卸载曲线平移,可以与高荷载速率对应的应力–应变曲线重合。
Stress-strain curve at slow loading-rate obtained in alternating loading rate test is shifted along the unloading curves, and then it overlapped on stress-strain curve at a fast loading rate.
将在交替变换荷载速率试验中得到的对应于低荷载速率的应力–应变曲线沿着卸载曲线平移,可以与高荷载速率对应的应力–应变曲线重合。
Stress-strain curve at slow loading-rate obtained in alternating loading rate test is shifted along the unloading curves, and then it overlapped on stress-strain curve at a fast loading rate.
应用推荐