佩莱格设计的镜面井字游戏是一个超赞的迷你视觉幻想棋盘游戏,半o半x的棋子只有在玩起来放在棋盘上的时候才完整。
Mirror tic Tac Toe by Peleg Design is a rad little optical illusion board game with half o's and X's that only are complete when put in play.
本文针对“二元结构”含水层研究了在定流量抽水下非完整井非稳定流情况下的计算方法。
The general drawdown equation and its particular cases for a partially penetrating well discharging at a constant rate from an aquifer-aquitard system are derived and investigated.
优选压裂井数据库中的数据记录可能不准确或不完整,不能反映地层真实情况。
The data records may be incomplete in the candidate selection database, which can not reflect the reality of the formations.
第一个发现并在这一领域的完整的问题是与E - 1井。
The first observed well integrity problem in this field was with the E-1 well.
为了切实的保护好电信的通信管道和通信线路,一套完整而且功能强大的通讯管网管理系统就应运而生了——通信人井监控报警系统。
In order to protect them, it is necessary to build a set of powerful and complete Manage System for telecom pipe net.
完整井情况下的锥探灌浆,其渗入型式可按单向渠道网络模型下的竖向渗流形式来考虑。
For a full well excavated down to the impervious stratum, the penetrating pattern could be considered as a model of canal network according to the seepage laws of vertical flow.
非完整反滤回灌井井流运动由砂反滤层的竖向流和非完整回灌井井流组合而成。
Vertical flow of the sandy filter layer and well flow of the common partially penetrating recharge well are combined to make a well flow of the partially penetrating recharge well with a filter layer.
合理诊断完整性需要对油气井行为有深入的理解,通常我们所称的完整性动力学是指井系统对完整性做出的一系列响应行为。
Diagnosing integrity properly demands a new understanding of well behaviour. Integrity dynamics is what we call the behaviour of the well system in response to its integrity.
混频器的高速和小轨道相结合,提供完整和统一的混合真正的微孔板的每个井的涡旋行动。
The mixer's high speed and small orbit combine to offer true vortexing action in each well of the microplate for complete and uniform mixing.
相较于使用淡水压裂,利用就近水源调制的压裂液体系可以保障储层的完整性并最大限度地提高单井产量。
The use of produced water and other higher salinity waters for tailored fluids maintains reservoir integrity and maximizes production when compared to freshwater.
在水平井生产过程中,井筒内管流与地层渗流互相制约、互相影响、互为边界条件,从而构成了一个完整的水动力学体系。
During the producing process of a horizontal well, fluid flow in well bore and stratum filtering flow have the restraining and effecting actions.
采用真空预压法有效加固的深度小于动态完整井所能达到的深度、其残余沉降量大于其竖向回弹量。
By the vacuum preloading, the efficient reinforced depth is less than the depth of the dynamic full-wells, and the remained sedimentation is more than the vertical sprang quantity.
采用真空预压法有效加固的深度小于动态完整井所能达到的深度、其残余沉降量大于其竖向回弹量。
By the vacuum preloading, the efficient reinforced depth is less than the depth of the dynamic full-wells, and the remained sedimentation is more than the vertical sprang quantity.
应用推荐