井楼住宅是一次不一样的体验,激动人心。它超越普通起居空间的限制。
The Shaft House is an unexpected and exciting spatial experience that survives the limits of our ordinary living Spaces.
好的钻井机可以打出24米深的井,这个长度相当于7层楼。
Well borers can make a 24-meter well which corresponds to a 7-storey building.
几个台阶通向一楼和楼梯井;它们底部宽,上面窄,铁扶手镶嵌到墙里面,朝外弯曲,跟街道持平。
Several steps led up to the first floor and stairwell; they were wide at the bottom, narrower above, set between walls topped with iron banisters and curving outwards at street level.
原从地面至五楼的电梯将被更新,同时风井将改为防火的。
The elevator that runs from the ground floor to the fifth floor will be replaced and will ascend and descend in a new, fire-resistant shaft.
10号公寓楼的房间有45平方米,有厨房,是标准的预制板建筑住房,有灰色的混凝土外墙和风可以从外面呼呼吹进来的楼梯井。
A 45-square meter apartment with a kitchenette in a standardized prefabricated tenement with thick, gray concrete walls and a stairwell which the wind whistles through from outside.
在二楼和三楼不锈钢网格构成楼梯井,将卧室空间和公共交通空间空间式地分离开来。
On the second and third floors the stairwell is encased in a stainless steel mesh. This detaches the circulation space and spatially breaks up the bedroom areas.
楼平3井是河南油田的一口超浅层中短半径大位移水平井试验井,不但位垂比达2。
Louping well 3 is a ultra-shallow extended reach horizontal test well with medium-short radius, its displacement-TVD ratio equals to 2.
本文结合巨野矿区赵楼矿井实际建设情况对深厚冲积层建井技术进行了探讨和总结。
The mine construction technology in deep and thick alluvium associated with the practical situation of Juye Zhaolou mine are talked about and summarized in this paper.
许楼煤矿在主井人工冻结巨厚砾岩段施工中,采用了控制爆破技术。
A controlled blasting technology was applied to the construction of freezing thick gravel stratum section in the main shaft of Xulou Mine.
游翠湖、云南讲武堂、金马坊、东西寺塔、近日楼;晚餐后游览南屏步行街夜市、王府井。
Vist Green Lake, Yunnan military academy, Golden Horse Square, East and West Temple, the recent House; dinner walking tour Nanping Street night market, Wangfujing.
在已顺利施工完成的赵楼矿冻结工程中,根据赵楼矿主、副、风井的具体情况,设计时分别采用了三种不同的冻结孔布置方式,在同一个冻结站运行的情况下得到不同的冻结效果。
This paper summarizes three fashions of the freezing construction of the main and auxiliary and wind shaft of Zhaolou Colliery. It gained the different freezing effect at the same freezing station.
1996年任楼煤矿首采面曾因隐伏导水陷落柱突水,引发淹井灾害,造成3.5亿元的重大经济损失。
Because of water outburst by hidden conducting Karst collapse column at the mining area of Renlou coal mine, the flood was caused in 1996, which causes losses up to 3.5 hundred million yuan.
钢筋混凝土楼(屋)盖结构大都采用单向板、双向板、主次梁结构、无梁楼板以及井字梁结构等。
The one-way slab, two-way slabs, principal and subordinate-beam structure, non-beam structure and the grid-beam structure are putting into use in the reinforced concrete slab.
钢筋混凝土楼(屋)盖结构大都采用单向板、双向板、主次梁结构、无梁楼板以及井字梁结构等。
The one-way slab, two-way slabs, principal and subordinate-beam structure, non-beam structure and the grid-beam structure are putting into use in the reinforced concrete slab.
应用推荐