东电解释说,进行测量的技术人员没有进行第二次测量就吓得跑了出去,他的测量地点是反应堆地下室发电机组建筑里的一个水池。
Tepco said at first that the worker who took the measurement, of a pool of water in the reactor's basement turbine building, had fled before taking a second reading.
停堆初期(第一阶段)的冷却过程:通过蒸汽发生器将反应堆冷却剂系统的能量传输给二次侧的蒸汽。
The initial phase of reactor cooldown is accomplished by transferring heat from the reactor coolant system to the steam and power conversion system through the steam generator.
按照最优控制理论,把压水反应堆的负荷跟踪控制问题描述为一个非线性二次型最优控制问题。
According to the optimal control theory, the problem of load following operation in a pressurized water reactor is formulated as a nonlinear quadratic optimal control problem.
按照最优控制理论,把压水反应堆的负荷跟踪控制问题描述为一个非线性二次型最优控制问题。
According to the optimal control theory, the problem of load following operation in a pressurized water reactor is formulated as a nonlinear quadratic optimal control problem.
应用推荐