而PT二次压降又是引起电能计量装置综合误差的直接原因之一。
PT secondary voltage step-down is one of the reason which causes the comprehensive error of the electric energy metering equipment.
基于对称分量法,对电能表中性点虚接后的电压互感器二次压降进行了分析,得出了正确接线前后的计量误差变化量。
The on-site test results indicate that energy meter's neutral point virtual connection has a great effect on PT secondary voltage drop.
电能计量综合误差是由电压互感器的合成误差、电流互感器的合成误差、电能表的误差、电压互感器二次导线压降所引起的计量组成。
There exits a compound error problem in the electrical measurement, which is composed of PT synthetic error, ct synthetic error, electrical energy measurement error and secondary potential of PT.
介绍了综采割煤二次负压降尘装置结构、工作原理以及在朔里煤矿综采工作面使用情况。
Author introduces the structure and the working principle of the secondary dust removal device with negative pressure as well as the application to fully mechanized mining face in Shuoli colliery.
介绍了综采割煤二次负压降尘装置结构、工作原理以及在朔里煤矿综采工作面使用情况。
Author introduces the structure and the working principle of the secondary dust removal device with negative pressure as well as the application to fully mechanized mining face in Shuoli colliery.
应用推荐