质量控制点是土木工程施工中对质量进行事前控制的常用方法。
The quality control point is the common method of the quality prior-control during civil engineering construction.
全过程监理是对某项工程质量的事前控制、事中控制、事后控制。
The whole process of supervision is the quality of a project control things in pre-control, mid-control and after control.
合理确定招标工程量清单是有效实施工程造价事前控制的重要环节。
To make BOQ (Bill of Quantity) reasonable is a key measure to approach the goal of preceding cost control effectively.
借贷契约就为银行如何实施这种风险的事前控制提供了一个很好的载体。
So loan contract is the carrier that helps the implement of ex ante control of credit risks.
事前控制是强调在输入阶段进行控制,以确保在转化过程中符合必要的标准。
Feed_forward control focuses on the regulation of inputs to ensure that they meet the standards necessary for the transformation process.
根据控制过程划分,人力资源成本管理可分为事前控制、事中控制和事后控制。
According to the partition of the control process, the management of human resources cost can be divided into advance control, intermediate control and afterwards control.
意在通过合理约定及邀约条件设定,使之成为发包人规避工期延误风险事前控制的举措。
This paper tries to conduct some prior control measures to help the employer to control the delay risk through reasonable calculation and setting of the tender condition.
工程项目三大目标的鲁棒控制系统由事前控制系统、事中控制系统和事后控制系统组成。
The robust control system of project three targets is composed of beforehand control system, process control system and afterwards control system.
并就此分析了虚拟参考咨询项目事前控制、事中控制及事后控制,以期加强服务质量控制。
And to analyse the virtual reference service projects prior control, a matter of control and subsequent control, with a view to strengthening the quality of service control.
客户信用管理中的事前控制主要是在客户信用分析的基础上,做出客户选择和客户信用决策。
The beforehand control of customer credit management importantly chooses customer and decision customer credit quota on base of customer credit analysis.
详细阐述了事前控制、对模板的控制、浇灌程序的控制、混凝土构件蒸养控制以及成品保护措施。
Authors describe the control of formwork, pouring program, steaming maintenance of concrete components in detail, as well as the finished product protection measures.
目前测评专家已经提出了一些应对作假的方法,它们可被分为事前控制技术和事后识别技术两大类。
Psychometrical specialists have brought forward some methods to coping with faking. Two main categories are distinguished, which are the pre - preventing and post-detecting techniques.
实行“精细”化工程管理,从个细节成本出发,强调成本事前控制的重要性,是整个工程项目成功的基础。
During the process of implementing "fine" project management, starting from a detailed cost and stressing the importance of cost control in advance is the basis of project's success.
事前控制是指对工程准备阶段的控制,事中控制是指对工程施工过程的控制,事后控制是指工程结束后质量的控制。
Pre-control means the control of the project preparation stage, mid-control is the control of the construction process, after control means after the end of the project quality control.
地质调查项目设计预算是项目经费管理的事前控制和预测,是项目经费支出的依据,是项目经济管理工作的重中之重。
The plan and budget of geological survey projects were the earlier controls and forecast to project fund management.
本文从企业集中的一般理论入手,认为超过一定规模的企业集中需要竞争法加以规制,并且主要是通过事前控制和结构规制方式来实现的。
This article takes the view that concentrations between undertakings need to be regulated by the competition law, and mostly realizes through the prior and structural ways.
为了控制可能的火灾,事前必须制定好计划并组织好警报系统、救火队和灭火人员。
To control fires, an alarm system, fire fighting teams, and beaters must be organized in advance and plans prepared.
我们可以使用事前,事中,事后的原则进行控制,以识别阻止或减少员工偷窃的方法。
Employee theft: We can use the concept of feed forward, concurrent, and feedback control to identify measures for deterring or reducing employee theft.
再一次,我们可以使用事前、事中、事后的原则控制以识别管理者采取的行动。
Workplace security: Once again , we can use the concept of feedforward, concurrent . and feedback control to identify actions that managers can take.
然而,伊朗机场执行主任说,飞行员与地面飞行控制人员在飞机失事前的对话并没有出现问题的迹象。
However, the managing director of Iran's airport authority said there were no indications of problems in conversations between the pilot and ground controllers before the crash.
变被动为主动,变事后响应为事前检测预防,将管道运行的风险水平控制在合理的和可接受的范围内。
The author presents that more active, prior detection and prevention should be made to control a reasonable and acceptable level of gas pipeline risk.
事前成本控制主要包括成本预测、成本决策和成本计划三项内容。
The cost control in advance includes cost forecast, cost decision and cost planning.
全员重视事前的周密计划和严格的过程管理与控制,事后的分析与持续完善,保证了产品的权威性。
Full attention to the carefully planned in advance and strict process management and control, ex post facto analysis and continuous improvement to ensure the authority of the product.
结合工作实际,从事前、事中、事后等方面叙述了消防气体灭火专业监理工程师如何实施过程控制。
Combined with the practice, this paper thoroughly narrates the application process control of fire fighting with gas from the view of supervision engineer.
在目前,有许多的企业因未对应收账款采取有效的事前、事后控制,导致企业的资金紧张,甚至陷入财务危机。
Currently, many companies have no appropriate beforehand or afterward controls on accounts receivable, which resulted in poor liquidity, or even financial crisis.
价值分析是将技术与经济相结合,降低产品成本的重要方法,是事前成本控制的首要途径。
Value analysis is an important way to combine technology with economics and reduce produce costs. It is also a foremost approach to control Prevent costs.
以信息系统为基础,旨在对安全生产进行事前、事中、事后控制,并对该体系的结构和内容进行分析和讨论。
The safety management system aims at the safety control before the in the event, and after the event. The structure and contents of the system are analyzed and discussed.
以信息系统为基础,旨在对安全生产进行事前、事中、事后控制,并对该体系的结构和内容进行分析和讨论。
The safety management system aims at the safety control before the in the event, and after the event. The structure and contents of the system are analyzed and discussed.
应用推荐