• 乌江渡水电站我国成功地兴建岩溶地区的大型水电工程

    The Wujiang Du water power station is a large project successfully built on the karst terrain.

    youdao

  • 乌江水电站扩机工程施工区地质条件复杂,岩溶发育,存在渗漏条件。

    The construction area of the extension project of Wujiangdu Hydropower Station has complex geologic conditions, developed karst with strong seepage conditions.

    youdao

  • 水电站贵州省乌江梯级开发一个龙头电站

    Hongjia Ferry hydropower station is a tap station of wujiang River step exploitation in Guizhou province.

    youdao

  • 乌江洪家水电站主体工程监理招标严格按国家招标法进行。

    Tendering for supervision engineers in main civil projects of Hongjiadu Hydropower Station was strictly followed the state tendering and bidding law.

    youdao

  • 洪家水电站坝址河床狭窄水位流量变幅

    The dam site valley of Hongjiadu Hydropower Station is narrow, amplitude variation of water level and discharge at it are large.

    youdao

  • 洪家水电站坝址河床狭窄水位流量变幅

    The dam site valley of Hongjiadu Hydropower Station is narrow, amplitude variation of water level and discharge at it are large.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定