此外,输入测试数据的创建是通过对来自在测系统的主数据的自动导入来加速的。
Additionally, the creation of input test data is accelerated through automatic importing of master data from the system under test.
本文介绍了一种截割部水力测功试验加载系统,分析了系统主参数确定的依据。设计得到实用验证。
The paper introduces a test loading system with hydraulic dynamometer for cutting gearhead, analyzes the basis for determining main parameters of system. The design has been verified by practice.
本文介绍了一种截割部水力测功试验加载系统,分析了系统主参数确定的依据。设计得到实用验证。
The paper introduces a test loading system with hydraulic dynamometer for cutting gearhead, analyzes the basis for determining main parameters of system. The design has been verified by practice.
应用推荐