处理主数据的部分或所有应用程序用本地数据库存储这些信息,并可能同时存储非主数据。
Some or all of the applications dealing with master data have a local database storing this information and maybe non-master data.
在这种场景中,主数据的所有属性保存在应用程序系统中,没有经过整理,质量仍然很差,只是把部分属性保存在MDM系统中了。
In this scenario, all attributes of the master data attributes remain with low quality without harmonization in the application systems except for the attributes persisted in the MDM system.
数据采集人员使用该表单,它是主应用程序的一部分。
Data collectors use this form, which is part of the primary application.
SPU对DMA GET进行排队,从而将涉及的数据集的一部分从主内存传输到一个缓冲区。
The SPU queues a DMA GET to pull a portion of the problem data set from main memory to a buffer.
因为db2缓冲池是系统主内存的一部分,DB 2数据库管理器在它读取或写入磁盘介质时将它分配给缓存表和索引数据。
Since a DB2 buffer pool is a part of the main memory of the system, the DB2 database manager allocates it for caching tables and index data when it reads or writes to and from media disks.
SPU (a) 对DMAPUT 进行排队来传输一号缓冲区的内容,然后 (b) 对 DMAGETB 进行排队,从而在 PUT之后用主内存中的下一部分数据重新填充这个缓冲区。
The SPU (a) queues a DMA PUT to transmit the contents of buffer #1 and then (b) queues a DMA GETB to execute after the PUT to refill the buffer with the next portion of data from main memory.
SPU 对DMA GET 进行排队,从而将涉及的数据集的另一部分从主内存传输到二号缓冲区。
The SPU queues a DMA GET to pull a portion of the problem data set from main memory into buffer #2.
利用主成分分析法,对上海海运学院“教师课堂教学质量评价指标体系”的部分样本数据进行统计分析。
Using the principal component analysis method, this paper analyzes a part of the sample data from the "Classroom Teaching Quality Evaluation System" of Shanghai Maritime University.
主站部分负责数据的处理和传输,与工作站进行数据交互。
The master was responsible for data processing and transmission, with workstations for data exchange.
利用主元分析法,可以在保留原有数据信息特征的基础上,消除变量关联和部分系统干扰,简化分析的复杂程度。
It can eliminate the correlation between variables and disturbance of system and can simplify complicated degree by PCA when reserving enough features of original data information.
故障检测部分包括主处理芯片的选择、针对主处理器的外围电路的扩展、数据通信方式的确定和抗干扰方法的选择。
The detection method of mechanical faulty includes how to choice the microprocessor and how to extend the circuit. The communication methods and the anti-interfere has been decided.
SAP系统电气部分的主数据及BOM维护、创建;
SAP master data & BOM creation, maintenance for electrical system;
第2部分进行的是在投影寻踪思想下对高维数据主成分分析降维的理论分析和实践应用;
Part 2 is in the Projection Pursuit ideology high-dimensional data principal component analysis dimensionality reduction theoretical analysis and practical application;
ASI总线系统由主站、从站和传输系统3部分组成,而传输系统又由两芯asi电缆、A SI电源和数据解耦电路构成。
ASI system consists of the master, the slave and the transmission system. The transmission system is made up of the two wire ASI cable, ASI power supply and the data decoupling circuit.
ASI总线系统由主站、从站和传输系统3部分组成,而传输系统又由两芯asi电缆、A SI电源和数据解耦电路构成。
ASI system consists of the master, the slave and the transmission system. The transmission system is made up of the two wire ASI cable, ASI power supply and the data decoupling circuit.
应用推荐