华能汕头发电厂1号、2号机组发生启动给水泵时锅炉主燃料跳闸(MFT)的事故。
The boiler MFT (master fuel trip) protection was actuated during start up of feed water pump A of Unit 1 and 2 in Huaneng Shantou Power Plant.
分析丰城发电厂4台机组主保护和主要辅机的热工保护出现异动的具体情况,提出了完善的措施和方法。
By analyzing the abnormal operations of the thermal process protections for the 4 generating units in Fengcheng power plant, measures for improvement were put forth and implemented.
某水力发电厂已建主厂房为钢筋混凝土框架结构。
The main building of a power plant was the reinforced concrete frame building.
对邹县发电厂四期工程和系统状况进行了介绍,确定了主蒸汽系统和主给水系统管道的设计参数,选择了管道材料。
Project and system situation in Zouxian Power Plant were introduced, and the piping design parameters and the piping material of main steam system and main feed water system were determined.
电气主接线是指发电厂、变电站、换流站中,为满足预定的功率传送和运行要求而设计的、表明高压电气设备之间相互连接关系的传送能量的电路。
The UHVDC converter substation is quite different from traditional ones, so it's necessary for carrying out specific research of main electrical scheme and equipment parameters.
电气主接线是指发电厂、变电站、换流站中,为满足预定的功率传送和运行要求而设计的、表明高压电气设备之间相互连接关系的传送能量的电路。
The UHVDC converter substation is quite different from traditional ones, so it's necessary for carrying out specific research of main electrical scheme and equipment parameters.